Aston Church Road Overbridge

Bridge in Birmingham, England
  • High Speed 2
  • Cross Country Route
LocaleBirmingham, EnglandLocationMap

Aston Church Road Overbridge is a planned road bridge in Birmingham, England.[1]

Background

The existing Aston Court Overbridge is not long enough to allow High Speed 2 to pass underneath. As part of the project, it will be demolished and replaced with a new structure.[2]

History

Planning

The initial design for the bridge was revealed to the public in 2021. A revised design was released in November 2022 with a wider walkway and altered lighting.[3][4] The bridge was given planning permission in September 2023.[2]

Construction

Preperatory works began in 2022.[2]

References

  1. ^ "Aston Church Road Overbridge" (PDF). High Speed 2. Retrieved 2023-09-02.
  2. ^ a b c Haynes, Jane (2023-09-01). "Glimpse of future shows how new HS2 bridge will connect Nechells and Saltley". BirminghamLive. Retrieved 2023-09-01.
  3. ^ Johnson, Thomas (2022-11-16). "HS2 reveals updated Birmingham bridge designs after community feedback". New Civil Engineer. Retrieved 2023-09-01.
  4. ^ Cramp, Thomas (2022-11-15). "Designs for brown HS2 bridge with LED lights unveiled for Birmingham". BirminghamLive. Retrieved 2023-09-01.
  • v
  • t
  • e
High Speed 2
Infrastructure
  • Aston Church Road Overbridge
  • Automated people mover
  • Balsall Common Viaduct
  • Chiltern tunnel
  • Colne Valley Viaduct
  • Euston tunnel
  • Marston Box Rail Bridge
  • Northolt tunnel
  • Rolling stock
  • Thame Valley Viaduct
  • Washwood Heath depot
  • Willesden Logistics Hub
  • Wendover Dean Viaduct
Places affectedReceptionStations
New/New high speed rail section
Existing
Cancelled
Related high speed projects