Bãi Cháy Bridge

Bridge in Quảng Ninh Province
20°57′37″N 107°03′57″E / 20.9603°N 107.0658°E / 20.9603; 107.0658Carries4 lanes (cable-stayed section) and 6 lanes (other sections), 2 lanes each way and 2 pedestrian lanesCrossesHạ Long BayLocaleQuảng Ninh Province, VietnamMaintained byMinistry of Transport of VietnamCharacteristicsDesignCable-stayed bridgeTotal length1,106 meters (3,629 ft)Width25 meters (82 ft)Height150 meters (490 ft)Longest span435 meters (1,427 ft)Clearance below50 meters (160 ft)HistoryConstructed byShimizu
Sumitomo Mitsui ConstructionConstruction startMay 18, 2003OpenedDecember 2, 2006LocationMap

The Bãi Cháy Bridge (Vietnamese: Cầu Bãi Cháy) is a cable-stayed bridge on Highway 18, connecting Hồng Gai with Bãi Cháy over the Cửa Lục straits, separating Cửa Lục Bay with Hạ Long Bay, on the territory of Hạ Long city, Quảng Ninh province, Vietnam. It is the first, and at the time of its inauguration, the longest central-line cable-stayed bridge in Vietnam.

Design

Drone shot of Bãi Cháy bridge in 2023

The bridge has two outer span of reinforced pre-stressed concrete box beams, which are the widest of the world for this type of bridge. The towers are located on a huge pneumatic caisson foundation system, a modern construction technology first applied in Vietnam on this project. The bridge was constructed using a balanced cantilever technology, wherein the bridge beams reaching out over the water and the aligned ends connect at a head height of 50 metres (160 ft) above the water level. This technique assured that vessels could still operate normally during the construction process.

The bridge was completed and opened for traffic on December 2, 2006. The bridge was built to address the needs of the local people and tourists, and also to complete the discontinuation of the Bãi Cháy ferry line.

Technical details

  • Spans: 5 spans, main span of 435 meters (1,427 ft)
  • Navigable width: 150 meters (490 ft)
  • Load: Class A standard Japanese
  • Cost: about VND 1046 billions, 40-month construction period, to November 30, 2006 termination
  • Owner: Ministry of Transport, representing the owner: Project Management Unit 18-PMU18
  • Design consultant - monitor: Institute of bridges and structures in Japan
  • Contractor: Shimizu-Sumitomo Mitsui Construction

Gallery

  • Bãi Cháy Bridge view from afar
    Bãi Cháy Bridge view from afar
  • The bridge during construction
    The bridge during construction
  • Bãi Cháy Bridge at night
    Bãi Cháy Bridge at night

See also

References

20°57′37″N 107°03′57″E / 20.96028°N 107.06583°E / 20.96028; 107.06583

  • v
  • t
  • e
Cable-stayed bridges in Southeast Asia
 Brunei
Suramadu Bridge
 Cambodia Indonesia Malaysia Philippines Thailand Vietnam
Cable-stayed bridges by country


Stub icon

This article about a specific bridge or group of bridges in Vietnam is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e