Chengdu–Mianyang–Leshan intercity railway

Railway line in Sichuan, China
4 ft 8+12 in) standard gaugeElectrification25 kV 50 HzOperating speed250 km/h (155 mph)
Chengdu–Mianyang–Leshan ICR Route Map
Legend
Xi'an-Chengdu HSR
Baoji–Chengdu railway
Jiangyou
Baoji–Chengdu railway
Qinglian
Baoji–Chengdu railway
Mianyang
Baoji–Chengdu railway
Luojiang East
Baoji–Chengdu railway
Deyang
Baoji–Chengdu railway
Jingyang
Guanghan North
Qingbaijiang East
Xindu East
Chengdu–Chongqing railway
Chengdu East
Chengdu–Chongqing ICR
Chengdu South
Chengdu–Kunming Railway
Shuangliu West
Xinjin
Xinjin South
Pengshan North
Meishan East
Qingshen
Leshan
Emei
Emeishan
Chengdu–Guiyang HSR

Chengdu–Mianyang–Leshan intercity railway (simplified Chinese: 成绵乐客运专线; traditional Chinese: 成綿樂客運專線; pinyin: Chéng-Mián-Lè Kèyùn Zhuānxiàn) is a higher-speed intercity railway in Sichuan Province that connects Mianyang, Chengdu, Deyang, Meishan, Emei and Leshan. The line is 314 km (195 mi) in length and can accommodate trains traveling at the speed of 200 km/h (124 mph). Construction began in 2008 and was completed on June 29, 2014.[1] Revenue service began on December 20, 2014.[2]

Route & service

Under the plan, the Chengdu–Mianyang–Leshan intercity railway starts at the renovated Chengdu railway station, going north through Deyang to Mianyang, stopping at Jiangyou. Southbound, the railway line passes through Chengdu Shuangliu International Airport to Meishan and Emei, ending in Leshan. Altogether ten cities, namely Jiangyou, Mianyang, Deyang, Guanghan, Chengdu, Pengshan, Meishan, Jiajiang, Emei and Leshan, are linked together from north to south by the railway. The length of the two-way passenger line is total 314 km (195 mi), with a designed speed of 200 km/h (124 mph).

There are 21 stations along the route. Like public buses, the intercity trains run from 6am till 11pm. During peak hours, a train leaves the station every few minutes.

History

The Chengdu–Mianyang–Leshan intercity railway was a major reconstruction project in Sichuan following the earthquake of May 2008.[3] The National Development and Reform Commission (NDRC) approved the construction of the passenger railway line running from Jiangyou to Chengdu and Emei at a cost of RMB 42 billion. Upon completion of this intercity line, it would take only 51 and 54 minutes respectively to travel by train from Chengdu to Jiangyou and E'mei situated at both ends of the line. Trains can easily pass through 10 cities within two hours.

Construction began on December 20, 2008, and was expected to take four years. The line opened on December 20, 2014.

References

  1. ^ "Chengdu-Mianyang-Leshan ready for service". Chinadaily.com.cn. Retrieved 2022-05-26.
  2. ^ 成绵乐高铁 千呼万唤始出来. Gaotie.cn (in Simplified Chinese). 2014-12-19.
  3. ^ "Chengdu-Mianyang-Leshan Inter-City Rail Gets Green Light (hktdc.com)". Info.hktdc.com. 2008-10-27. Retrieved 2022-05-26.
  • v
  • t
  • e
Public transportation in Sichuan Province (SC)
Chengdu Metro Chengdu Metro Chengdu Metro
Lines in operation
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 17
  • 18
  • 19
Under construction
  • 8 (phase II)
  • 10 (phase III)
  • 13
  • 17 (phase II)
  • 18 (phase III)
  • 27
  • 30
  • S3
  • S5
  • S11
Guang'an Metro Guang'an Metro
Under construction
  •  1 
Planned
  •  2 
China Railway C-train
Lines in operation
  •  CG 
  •  CP 
China Railway Intercity rails
Lines in operation
Chengdu Trams
Lines in operation
  • T2
Under construction
  •  Xinjin R1 
  •  Dujiangyan M-TR 
Under planning
  • T1
Other rail transits
Under construction
  •  Dujiangyan–Siguniangshan 
Chengdu BRT
Lines in operation
  • Line K1 / Line K1A (clockwise)
  • Line K2 / Line K2A (anticlockwise)
  • Line K3
  • Line K5
  • Line K11
  • Line K12
  • Line K13
  • Line K16
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
  • China: AH
  • BJ
  • CQ
  • FJ
  • GD/HK/MO
  • GS
  • GX
  • GZ
  • HA
  • HB
  • HE
  • HI
  • HL
  • HN
  • JL
  • JS
  • JX
  • LN
  • NM
  • NX
  • QH
  • SC
  • SD
  • SH
  • SN
  • SX
  • TJ
  • XJ
  • XZ
  • YN
  • ZJ
  • v
  • t
  • e
High-speed demonstrative maglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
To Hong Kong
To Taipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
Regional intercity
Upgraded old lines
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines