EA201 series

Indonesian train type
You can help expand this article with text translated from the corresponding article in Indonesian. (November 2020) Click [show] for important translation instructions.
  • View a machine-translated version of the Indonesian article.
  • Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
  • Consider adding a topic to this template: there are already 290 articles in the main category, and specifying|topic= will aid in categorization.
  • Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
  • You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is Content in this edit is translated from the existing Indonesian Wikipedia article at [[:id:Kereta Rel Listrik Indonesia]]; see its history for attribution.
  • You may also add the template {{Translated|id|Kereta Rel Listrik Indonesia}} to the talk page.
  • For more guidance, see Wikipedia:Translation.
EA201 series
Kereta Rel Listrik Indonesia
KRL-I
Scrapped trains at Cikaum in 2016
In service2003–2014[1]
ManufacturerIndustri Kereta Api
Built atMadiun
Constructed2001[1]
Entered service2003[1]
Refurbished2007-2009[1]
Number built8 unit (2 set)
Number in servicenone
Number preservednone
Number scrapped8
PredecessorEA102 series
SuccessorEA202 series
Formation4 cars per set
OperatorsPT Kereta Api Divisi Jabodetabek (now PT Kereta Commuter Indonesia)
DepotsBukit Duri (BUD)
Lines served (eject)
Specifications
Car body constructionStainless steel
Car length20,000 mm (65 ft 7 in)
Width2,990 mm (9 ft 10 in)
Height3,820 mm (12 ft 6 in)
Doors3 pairs per side
Maximum speed120 km/h (75 mph)
Traction systemIGBT-VVVF
AuxiliariesStatic Inverter (SIV)
Power supplyOHLE
Electric system(s)1.500 V DC overhead
Current collector(s)Pantograph
Braking system(s)Electropneumatic Regenerative Brake
Safety system(s)TMS and Deadman Control
Coupling systemAAR/Janney coupler
Track gauge1,067 mm (3 ft 6 in)

EA201 series also known as Kereta Rel Listrik Indonesia[2] (lit.'Indonesian Electric Rail Train', abbreviated as KRL-I) was the first train assembled entirely in Indonesia. It was assembled at Industri Kereta Api in 2001, and began operating in 2003. Initially EA201 series often operated as the Serpong Express from Tanah AbangSerpong and Pakuan Express from Tanah Abang–Bogor, but in 2007 EA201 series was operated for the Ciliwung Ring. Between 1 December 2012 and the end of service in 2014, EA201 series was operated as Eject service of Kampung BandanJakarta Kota due to the elimination of the Ciliwung route due to the implementation of the Loop Line pattern.[1]

Formation

List of formation of EA201 series[2]
  Designation
Numbering 1 2 3 4
TS1 K1 1 03 01 K1 1 03 02 K1 1 03 03 K1 1 03 04
TS2 K1 1 03 05 K1 1 03 06 K1 1 03 07 K1 1 03 08

References

  1. ^ a b c d e "KRL AC Pertama Indonesia Ini Akhirnya Disemayamkan Di Cikaum" (in Indonesian). Amri Bintang. Retrieved 8 December 2016.
  2. ^ a b KA Magazine June 2014 Edition
  • v
  • t
  • e
  • v
  • t
  • e
Electric multiple units of KAI Commuter
In service
Retired
Air-conditioned units
Non air-conditioned units
  • ESS 100/200 series
  • EA101 series
  • EA102 series
  • ED101 series
  • ABB Hyundai
Future
  • EA204 series
  • KCI-SFC120-V series