Feidong railway station

Closed railway station in Hefei, Anhui
31°51′50″N 117°28′48″E / 31.864°N 117.480°E / 31.864; 117.480Line(s)Closed for renovationHistoryOpenedMay 1, 2008 (2008-05-01)

Feidong railway station (Chinese: 肥东站; pinyin: Féidōng zhàn) is a closed railway station in Feidong County, Hefei, Anhui, China. The railway station closed on 11 October 2023 and will reopen when North Riverside high-speed railway opens.[1][2]

History

Feidong railway station was built with the Hefei–Nanjing railway. The line opened on 18 April 2008 however the intermediate stations, including Feidong, did not open until 1 May.[3]

Passenger service was suspended from 16 April 2017 to allow the station to be rebuilt.[4]

On 28 June 2020 the station reopened with the second phase of the Shangqiu–Hangzhou high-speed railway.[5]

The railway station closed on 11 October 2023 and will reopen when North Riverside high-speed railway opens.[1][2]

Metro station

It will be connected to Feidong metro station on Line 2 (East extension) of Hefei Metro.

Preceding station China Railway High-speed China Railway High-speed Following station
Hefei South
towards Shangqiu
Shangqiu–Hangzhou high-speed railway Zhegao
towards Tonglu

References

  1. ^ a b "肥东站10月11日起停办客运业务".
  2. ^ a b "北沿江高铁16个设站位置公布:安徽新建大墅站 改建滁州站肥东站".
  3. ^ "合宁铁路 5月1日启用_新闻中心_新浪网". news.sina.com.cn. Retrieved 2020-06-30.
  4. ^ "铁路肥东站 暂停客运业务 | 《合肥晚报》多媒体数字报平台". epaper.hf365.com. Archived from the original on 2020-06-26. Retrieved 2020-06-30.
  5. ^ "肥东火车站周日恢复运营 -安青网". www.ahyouth.com. Retrieved 2020-06-30.


  • v
  • t
  • e