Fugen Nuclear Power Plant

Former nuclear test reactor in Japan
35°45′16″N 136°00′59″E / 35.75444°N 136.01639°E / 35.75444; 136.01639StatusDecommissionedConstruction beganMay 10, 1972 (1972-05-10)Commission dateMarch 20, 1979 (1979-03-20)Decommission dateMarch 29, 2003 (2003-03-29)Operator(s)Japan Atomic Energy AgencyNuclear power stationReactor typeHWLWRPower generation Units decommissioned1 x 165 MWNameplate capacity165 MWCapacity factor23.9%Annual net output345 GW·hExternal linksWebsitewww.jnc.go.jp/zfugenCommonsRelated media on Commons
[edit on Wikidata]
The Tsuruga NPP and Fugen NPP together in the same image

Fugen ふげん (Fugen) was a prototype Japanese nuclear test reactor. Fugen was a domestic Japanese design for a demonstration Advanced Thermal Reactor. It was a heavy water moderated, boiling light water cooled reactor.[1] The reactor was started in 1979 and shut down in 2003. As of 2018, it is undergoing decommissioning.[1] It is located in Myōjin-chō, in the city of Tsuruga, Fukui. The name "Fugen" is derived from Fugen Bosatsu (Samantabhadra), a Buddhist deity.

The reactor was the first in the world to use a full MOX fuel core. It had 772 assemblies, the most in the world. It has received the title of a historic landmark from the American Nuclear Society.

The design boils ordinary water like a boiling water reactor (BWR) but uses heavy water as a moderator as in a CANDU reactor. The electrical output was 165 MW and the thermal output was 557 MW.

  • Core temperature: 300 °C
  • Pellet centerline temperature: 2200 °C
  • Fuel conversion time: 6 months

The plant is located on a site that covers 267,694 m2 (66 acres); buildings occupy 7,762 m2 (1.9 acres), and it has 46,488 m2 of floor space. It employed 256 workers.[2]

Accidents

  • 14–16 April 1997: A tritium leakage was announced to the responsible authorities 30 hours after the event. During the following investigation it was shown that it already had 11 similar incidents. Five managers of the operator at that time (at the time Power Reactor and Nuclear Fuel Development Corporation) resigned.
  • 8 April 2002: About 200 cubic meters of steam escaped from a defective pipe. The reactor was switched off.

During dismantling operations it was found that walls with controls did not have the necessary strength at 25 of 34 points.

References

  1. ^ a b "History of Fugen | Reactor Decommissioning Research and Development Center". www.jaea.go.jp. Retrieved 10 July 2018.
  2. ^ JAEA (Japanese). Facilities Quick View Archived 2012-04-20 at the Wayback Machine.

External links

  • flagJapan portal
  • iconEnergy portal
  • Nuclear technology portal
Wikimedia Commons has media related to Fugen Nuclear Power Plant.
  • v
  • t
  • e
Reactors
(Active) LWR
Hokkaido
Tohoku
TEPCO
Chubu
Hokuriku
Kansai
Chugoku
Shikoku
Kyushu
JAPC
Closed
Canceled
Under construction
Other
  • Jōyō
    • research fast reactor
Organisations
Regulatory bodies
Companies
Research institutions
Other
Accidents
Anti-nuclear
movement
  • Category
  • Commons