GTRE GTX-35VS Kaveri

Afterburning turbofan aircraft engine

GTX-35VS Kaveri
GTRE GTX-35VS engine on display
Type Afterburning turbofan
National origin India
Manufacturer Gas Turbine Research Establishment
Godrej & Boyce
First run 1996
Major applications HAL Tejas, DRDO Ghatak
Number built 9[1]

The GTRE GTX-35VS Kaveri is an afterburning turbofan project developed by the Gas Turbine Research Establishment (GTRE), a lab under the Defence Research and Development Organisation (DRDO) in Bengaluru, India. An Indian design, the Kaveri was originally intended to power production models of the HAL Tejas Light Combat Aircraft (LCA) developed by Hindustan Aeronautics Limited. However, the Kaveri programme failed to satisfy the necessary technical requirements or keep up with its envisaged timelines and was officially delinked from the Tejas programme in September 2008.

After being on hold for nearly a decade a dry variant of the Kaveri engine is now being developed to power the DRDO Ghatak.[2]

History

Programme

In 1986, the Indian Defence Ministry's Defence Research and Development Organisation (DRDO) was authorized to launch a programme to develop an indigenous powerplant for the Light Combat Aircraft. It had already been decided early in the LCA programme to equip the prototype aircraft with the General Electric F404-GE-F2J3 afterburning turbofan engine, but if this parallel program was successful, it was intended to equip the production aircraft with this indigenous engine.

The DRDO assigned the lead development responsibility to its Gas Turbine Research Establishment (GTRE), which had some experience in developing jet engines. It had developed the GTX37-14U after-burning turbojet, which first ran in 1977, and was the first jet engine to be designed entirely in India.[3] A turbofan derivative, the GTX37-14UB, followed. The GTRE returned to turbojet technology with the greatly redesigned, but unsatisfactory, GTX-35.

For the LCA programme, the GTRE would again take up a turbofan design which it designated the GTX-35VS "Kaveri" (named after the Kaveri River). Full-scale development was authorized in April 1989 in what was then expected to be a 93-month programme projected to cost 3.82 billion (US$47.8 million). A new engine typically costs up to $2 billion to develop, according to engine industry executives.[4]

Development

The original plans called for 17 prototype test engines to be built. The first test engine consisted of only the core module (named "Kabini" , a major tributary and often cited starting point of the Kaveri river ), while the third engine was the first example fitted with variable stator vanes on the first three compressor stages. The Kabini core engine first ran in March 1995. Test runs of the first complete prototype Kaveri began in 1996 and all five ground-test examples were in testing by 1998; the initial flight tests were planned for the end of 1999, with its first test flight in an LCA prototype to follow the next year. However, progress in the Kaveri development programme was slowed by both political and technical difficulties.[5][6]

In 2002, little information had been publicly released concerning the nature of the Kaveri's technical challenges, but it was known that the Kaveri had a tendency to fail turbine blades, which required procuring blades from SNECMA (as well as digital engine control systems).[7]

Continuing development problems with the Kaveri resulted in the 2003 decision to procure the uprated F404-GE-IN20 engine for the eight pre-production Limited Series Production (LSP) aircraft and two naval prototypes. The ADA awarded General Electric a US$105 million contract in February 2004 for development engineering and production of 17 F404-IN20 engines, delivery of which is to begin in 2006.

In mid-2004, the Kaveri failed its high-altitude tests in Russia, ending the last hopes of introducing it with the first production Tejas aircraft.[8] This unfortunate development led the Indian Ministry of Defence (MoD) to order 40 more IN20 engines in 2005 for the first 20 production aircraft, and to openly appeal for international participation in completing development of the Kaveri. In February 2006, the ADA awarded a contract to SNECMA for technical assistance in working out the Kaveri's problems.[9]

In December 2004, it was revealed that the GTRE had spent over 13 billion (US$162.8 million) on developing the Kaveri. Furthermore, the Cabinet Committee on Security judged that the Kaveri would not be installed on the LCA before 2012, and revised its estimate for the projected total development cost to 28.39 billion (US$356 million).[10]

In April 2005, "There is good progress" on the development of the Kaveri engine, M. Natarajan, Scientific Adviser to the Defense Minister told The Hindu. "We are planning to integrate a prototype Kaveri engine into one of the LCA prototypes sometime in 2007 to understand the nuances of such a complex power-pack," he further told The Hindu.[11]

In February 2006, the US experts told PTI that "Kaveri is truly a world-class engine." "We are ready to join in partnership with the Defence Research and Development Organisation to make Kaveri work," General William J Begert of Pratt and Whitney, told PTI. But DRDO secretary Natrajan told PTI that "But Kaveri is and would remain an Indian project."[12]

On 5 February 2007, Scientific Adviser to Defense Minister M Natarajan said nearly 90 to 93 per cent of the expected performance had been realized and the government had recently floated an expression of interest to seek partners to move the programme further.[13] Till 11 February 2008, Kaveri had undergone 1,700 hours of tests and has been sent twice to Russia to undergo high-altitude tests for which India has no facility. The engine is also being tested to power the next generation of Unmanned Aerial Vehicles.[14]

In July 2007, GTRE divided Kaveri program into two separate programs. They are K9+ Program and K10 Program. K9+ Program is a program to prove concept of complete design and gain hand-on experience of aircraft engine integration and flight trials to cover a defined truncated flight envelope prior to the launch of production version of K10 Standard engine. While K10 Program is a joint venture (JV) partnership with a foreign engine manufacturer. K10 program engine will be final production standard Kaveri engine and shall have less weight and more reheat thrust along with certain other changes to meet the original design intent.[15]

In September 2008, it was announced that the Kaveri would not be ready in time for the Tejas, and that an in-production powerplant would have to be selected.[16] Development of the Kaveri by the GTRE would continue for other future applications. It was announced in November 2008 that the Kaveri engine will be installed on LCA by December 2009,[17] apparently for tests only.[citation needed]

In February 2009, it was published in Flightglobal that the GTRE had spent 20 billion (US$250.5 million) in developing the Kaveri engine since 1989, but the power-plant is still overweight and does not have the 21,000–22,500 lbf (93–100 kN) of thrust that its customer requires. Natarajan told Flightglobal that the programme will not be scrapped. "A team of air force engineers is working with GTRE and ADA in addressing the issues. As an ongoing project, the air force will be involved at the point of integrating the upgraded version of the engine with the aircraft," he told Flightglobal. "Discussions with Snecma have been going on for two years," he further adds. "Development and flight-testing of the new engine will take at least five to six years."[18]

In December 2009, Kaveri-Snecma JV was trying Back-door Entry in LCA. The People's Post reported that GTRE has agreed to de-link Kaveri from LCA, but has put in a proposal that when the first 40 GE-404 engines in the initial two squadrons of the LCA for the IAF, get phased out should be replaced by the Kaveri-Snecma engine, in future.[19]

On 3 May 2010, about 1880 hours of engine test had been completed on various prototypes of Kaveri Engine. A total of eight Kaveri Engines and four core engines have been manufactured, assembled and tested. High Altitude testing on core engine has been completed successfully.[20]

In June 2010, the Kaveri engine based on Snecma's new core, an uprated derivative of the M88-2 engine that powers the French Rafale fighter, providing 19,000–19,000 lbf (83–85 kN) of maximum thrust is being considered an option by DRDO.[21]

A press release in August 2010, stated that GTRE with the help of Central Institute of Aviation Motors (CIAM) of Russia is trying to match objective of fine tuning of Kaveri engine performance. Until August 2010, one major milestone which is altitude testing, simulating Kaveri engine performance at different altitude and achieving speed of Mach 1 had been completed successfully. One of Kaveri prototype (K9) was successfully flight tested at Gromov Flight Research Institute in Moscow, on 4 November 2010.

The test was conducted at the Flying Test Bed at Gromov, with the engine running right from the take-off to landing, flying for a period of over one hour up to an altitude of 6,000 m (20,000 ft). The engine helped the IL-76 aircraft test bed fly at speeds of 0.6 Mach in its maiden flight, according to the Defence Research and Development Organisation (DRDO).

"The engine control, performance and health during the flight were found to be excellent. With this test, Kaveri engine has completed a major milestone of development programme," it added. After completing these milestone Kaveri engine is flight-worthy.[22][23] The Kaveri engine was tested for the first time on a flying testbed and the trials were a success.[24]

Till April 2011, the first phase of Kaveri engine FTB trials have been completed successfully and further tests will continue from May 2011 onwards. The flight tests successfully carried out so far are up to 12 km (39,000 ft) maximum altitude and a maximum forward speed of 0.7 Mach.[25]

In its annual report for 2010–11, The Comptroller and Auditor General of India noted that 18.92 billion (US$236.9 million) had been spent on development, with only two out of the six milestones prescribed having been met. Among its deficiencies, CAG says the engine weight was higher than the design specifications, being 1,235 kg (2,723 lb) against 1,100 kg (2,400 lb), and there was no progress on developing the compressor, turbine and engine control systems.[26] DRDO has achieved some crucuial breakthrough in 2021 such as Near Isothermal Forging Technology that can produce all the five stages of high-pressure compressors (HPC) discs and single-crystal casting technology for turbine blades that will help in the aero engine development.[27][28][29]

Problems

The Kaveri program has attracted much criticism due to its ambitious objective which was seen competitive against western tech, protracted development time, cost overruns unsupported by the govt, and the DRDO's upgrading over clarity and openness in analyzing problems was a good development. but its mis-credited in comparison to retail business. Much of the criticism from out country competitive firms to sell program to them was not balanced in LCA program has been aimed at the Kaveri and Multi-Mode Radar programs which is in indigenous track. There has been much lack of public understanding of the degree of realism in the DRDO's planning schedules for various elements of the LCA programme, most particularly for the Kaveri development effort. France's SNECMA, with over half a century of successful jet engine development experience, took nearly 13 years to bring the Rafale fighter's M88 engine to low-volume production after bench testing had begun, which had spent enormous research funds, iterative development programs with cost overruns(but cost overruns were seen as integral part of RnD) and resources to fulfil their ambitious programme; a similar timespan for the less-experienced GTRE would see Kaveri production beginning no earlier than 2009 IF proper funds were provided by the govt of Bharath timely overcoming the cost overruns(which is integral part RnD not a discredit) and expansive requirements such as indigenous flying testbed programme, etc of GTRE . After successful ground tests the engine was first time tested on a flying test bed over foreign soil for high altitudes have witnessed some issues which needs further more development. but it was non-technically discredited as a failure by own country was biggest drag in development. in fact GTRE should have indigenous flying test bed, for not just one test but numerous tests, that enriches the development and modifications that could fulfill its target objectives which would be an ideal RnD programme. TEJAS fighter aircraft alone has a requirement of more than 100 units of engines, which alternatively choose American GE engines which costed around 800cr each which would be a total of 80,000 crores deal. but overall funds on Kaveri engine programme was around 2100cr which is just the cost of similar config THREE AMRICAN ENGINES. even though already made significant progress of 2/5 set objectives. with further 7000 cr budget in the extension Kaveri engine project could bring a valuable engine in 3–4 years with a comparative cost reduction of 400cr per each engine could save 30,000cr as of todays minimum estimate of just TEJAS FIGHTER AIRCRAFT programme. and a lot more cost cuts and development acceleration in various programmes of BHARATH Aerospace Sector.[30] Another criticism has been DRDO's reluctance to admit problems in the engine and its resistance to involve foreign engine manufacturers until the problems became too large to handle.

In August 2010, regarding the reasons for delay, a Ministry of Defense press release reported:[22]

  1. "Ab-initio development of state-of-the-art gas turbine technologies.
  2. Technical/technological complexities.
  3. Lack of availability of critical equipment & materials and denial of technologies by the technologically advanced countries.
  4. Lack of availability of test facilities in the country necessitating testing abroad.
  5. Non availability of skilled/technically specialized manpower."

Current status

The DRDO currently hopes to have the Kaveri engine ready for use on the Tejas in the latter half of the 2010s decade[31] and according to latest news still research on it is going on and the time to complete its research has been extended to 2011-2012.[20]

"In recent times, the engine has been able to produce thrust of 16,000–17,000 lbf (70–75 kN) but what the IAF and other stake-holders desire is power between 20,000–21,000 lbf (90–95 kN)", senior officials told The Hindu.[31] "On using the Kaveri for the LCA, they said the engine would be fitted on the first 40 LCAs to be supplied to the IAF when they come for upgrades to the DRDO in the latter half of the decade." Article further adds that in 2011, 50-60 test flights will be carried out to mature the engine in terms of reliability, safety and airworthiness.[31]

GTRE aims to integrate the Kaveri power-plant with HAL Tejas fighter. A test aircraft operated by Aeronautical Development Agency (ADA) will be used for the integration as per an industry source familiar with the programme. If the integration was successful, GTRE hopes to see a Tejas fly with a Kaveri power-plant by the end of 2013.[32]

In Lok Sabha on 10 December. 2012 Defence Minister A K Antony gave an update on the progress made by the Kaveri Engine Development Project as follows:

  1. So far, 9 prototypes of Kaveri Engine and 4 prototypes of Kabani (Core) Engine have been developed.
  2. 2,200 hours of test (ground and altitude conditions) has been conducted.
  3. The following two major milestones have been achieved:
    1. Successful completion of Official Altitude Testing (OAT); and
    2. Demonstration of First Block of flight of Kaveri Engine in Flying Test Bed (FTB).

Kaveri Engine was integrated with IL-76 Aircraft at Gromov Flight Research Institute (GFRI), Russia and flight test was successfully carried out up to 12 km (39,000 ft) maximum altitude and maximum forward speed of 0.7 Mach. Twenty Seven flights for 57 hours duration have been completed.[1]

DRDO demonstrated its technological capability in aero-engine technology. This has been a great achievement in the aerospace community of the country, when the first ever indigenously developed fighter aircraft engine was subjected to flight testing. Tacit knowledge acquired by the DRDO scientists during this project will also be applied for further aerospace technology. Kaveri spin-off engine can be used as propulsion system for Indian Unmanned Strike Air Vehicle (USAV).[33]

In January 2013, the GTRE director said that they are abandoning the plan for co-development with Snecma, but they still need an overseas partner, which will be selected through competitive bidding.[34]

In November 2014, The Defense Research and Development Organization (DRDO) decided to abandon the Kaveri engine (GTX-35VS ) programme due to its shortcomings.[35]

As per government statement in Rajya Sabha during Winter Session 2021, HAL Tejas FOC variant demands higher thrust which present Kaveri engine architecture is unable to provide hence will not be used. The engine did achieve higher Technology Readiness Level (TRL) in critical technology domains. There is proposal to jointly develop a new engine for HAL AMCA with the help of foreign partner using the know how from Kaveri engine programme.[36]

Prior to the high altitude test in 2022, the first prototype of dry Kaveri engine's performance was evaluated. The first phase included performance and operability at the high altitude test facility. A performance test was carried out on the second prototype, which included a new fan module, a short jet pipe, and an engine fuel control system.[37] GTRE is aiming to integrate Kaveri to DRDO Ghatak by 2026.[27]

Foreign help

On 4 July 2016, according to Indian media report, France offered to invest EUR 1 billion to revive India's combat jet engine project, proposing a joint development plan that could see the stalled Kaveri gas turbine powering indigenous Tejas fighters by 2020.[38]

On 20 November 2016, DRDO Director General for Aeronautics Cluster C P Ramanarayanan confirmed that DRDO and French Snecma have tied up to revive Kaveri Engine as part of the offsets deal for 36 Rafale jet. It is expected that the engine would be integrated and tested in LCA Tejas by 2018.[39] In 2018, La Tribune reported that French Snecma will help in production of the Kaveri by sharing M88's technology.[40]

Design

A low-bypass-ratio (BPR) afterburning turbofan engine featuring a six-stage core high-pressure (HP) compressor with variable inlet guide vanes (IGVs), a three-stage low-pressure (LP) compressor with transonic blading, an annular combustion chamber, and cooled single-stage HP and LP turbines. The development model is fitted with an advanced convergent-divergent ("con-di") variable nozzle, but the GTRE hopes to fit production Tejas aircraft with an axisymmetric, multi-axis thrust-vectoring nozzle to further enhance the LCA's agility. The core Turbojet engine of the Kaveri is the Kabini.

The general arrangement of the Kaveri is very similar to other contemporary combat engines, such as the Eurojet EJ200, General Electric F414 and Snecma M88. It has a very low bypass ratio (0.16:1). Similar low amounts of bypass on earlier engines, required only for afterburner and nozzle cooling,[41] introduced the term "'leaky' turbojet".

The Kaveri engine has been specifically designed for the Indian operating environment, which ranges from hot desert to the highest mountain range in the world. The GTRE's design envisions achieving a fan pressure ratio of 4:1 and an overall pressure ratio of 27:1, which it believes will permit the Tejas to "supercruise" (cruise supersonically without the use of the afterburner).

A two-phase plan has been in place since 2019 for Kaveri derivatives. It consists of a high-bypass-ratio turbofan based on the Kabini core and a non-afterburning version intended for use as an advanced jet trainer. The current Kaveri engine is modified and tested at Phase 1, the technology demonstration stage, to ensure that it satisfies the design specification. Additionally, Phase 2 money was granted to GTRE in order to produce five new prototype engines for Kaveri derivatives. Godrej Aerospace of Godrej & Boyce will manufacture the engines. By early 2024, the company plans to complete the first stage of development and be manufacturing eight modules comprising six 48 kN dry engines without an afterburner. The remaining modules will be provided over the course of 27 to 30 months. GTRE changed three Kaveri engines to the derivative model, two of them are undergoing demonstrator testing. At the GTRE test facility in Bangalore, the engines underwent 70 hours of ground testing, and at the Baranov Central Institute of Aviation Motor Development in Russia, they underwent 75 hours of altitude testing, simulating an altitude of 13,000 m (42,650 ft).[42][43][44] As per Ex Director Y Dilip, right now the development is on 73 kN engine with an afterburner, which is ready to go and the team is making an effort to fly it on HAL Tejas.[45]

Another concept being considered is an enlarged version of the Tejas which is being called Tejas MK2 with two engines fitted with fully vectoring nozzles, which might make the vertical tail redundant (the Tejas has no horizontal tail).[3]

An indigenous Full-Authority Digital Engine Control (FADEC) unit, called Kaveri Digital Engine Control Unit (KADECU) has been developed by the Defence Avionics Research Establishment (DARE), Bangalore. The Combat Vehicles Research and Development Establishment (CVRDE) of Avadi was responsible for the design and development of the Tejas aircraft-mounted accessory gear box (AMAGB) and the power take-off (PTO) shaft.

Applications

Specification (GTX-35VS Kaveri)

General characteristics

  • Type: Afterburning Turbofan
  • Length: 349.0 cm (137.4 in)
  • Diameter: 90.9 cm (35.8 in)
  • Dry weight: 1,180 kg (2,601 lb)

Components

  • Compressor: Two-spool, with low-pressure (LP) and high-pressure (HP) axial compressors:
    • LP compressor with 3 fan stages and transonic blading
    • HP compressor with 6 stages, including variable inlet guide vanes and first two stators
  • Combustors: Annular, with dump diffuser and air-blast fuel atomisers
  • Turbine: 1 LP stage and 1 HP stage

Performance

Engine cycle

  • Airflow: 78 kg (172 lb) per second
  • Bypass ratio: 0.16:1
  • Overall pressure ratio: 21.5:1
  • LP compressor pressure ratio: 3.4:1
  • HP compressor pressure ratio: 6.4:1
  • Turbine entry temperature: 2,600 °F (1,427 °C; 1,700 K)

See also

References

  1. ^ a b "Press Information Bureau English Releases". Archived from the original on 7 February 2015. Retrieved 6 February 2015.
  2. ^ "DRDO's stealth attack UAV back in focus as footage of demonstrator emerges". The Week. Archived from the original on 3 July 2022. Retrieved 27 March 2023.
  3. ^ a b Gunston, Bill (Ed.) (15 June 2006). "GTRE Kaveri" in Jane's Aero-Engines, Issue 14. Coulsdon, Surrey, UK: Jane's Information Group Limited. ISBN 0-7106-1405-5.
  4. ^ "Rolls-Royce in costly A350 engine redesign -sources". Reuters. 6 June 2011. Archived from the original on 18 April 2017. Retrieved 5 July 2021.
  5. ^ There was much criticism concerning the DRDO's planning schedules for various elements of the LCA programme, most particularly for the Kaveri development effort. France's Snecma, with over half a century of successful jet engine development experience, took nearly 13 years to bring the Rafale fighter's M88 engine to low-volume production after bench testing had begun; a similar timespan for the less-experienced GTRE would see Kaveri production beginning no earlier than 2009. (See Reddy, C. Manmohan (16 September 2002). LCA economics[usurped]. The Hindu
  6. ^ Mama, Hormuz (November 1998). LCA Update Archived 8 May 2001 at the Wayback Machine. Flight International via Bharat-Rakshak.com.
  7. ^ Anon. (30 May 2002). Snecma Aerospace India: a new stage in cross-border collaboration Archived 21 May 2006 at the Wayback Machine. SAFRAN Group website Le Webmag. Retrieved from "Military Aviation and Defense" section 14 September 2006.
  8. ^ Since India does not possess suitable aircraft, the high-altitude testing of the Kaveri is contracted to Russia, which uses a Tu-16 bomber for the purpose. Another Kaveri engine was delivered to Russia for further flight testing from June to September 2006, but on an Il-76 testbed instead of a Tu-16.
  9. ^ Jackson, Paul; Munson, Kenneth; & Peacock, Lindsay (Eds.) (2005). "ADA Tejas" in Jane's All The World's Aircraft 2005-06. Coulsdon, Surrey, UK: Jane's Information Group Limited. p. 195. ISBN 0-7106-2684-3.
  10. ^ Pandit, Rajat (16 July 2006). IAF may not get to fly LCA before 2010 Archived 20 July 2006 at the Wayback Machine. The Times of India.
  11. ^ "Good progress on Kaveri engine, says DRDO chief". The Hindu. Chennai, India. 26 April 2005. Archived from the original on 27 April 2005.
  12. ^ "India-defence.com". Archived from the original on 3 June 2009. Retrieved 4 August 2010.
  13. ^ Anon. (5 February 2007). Rediff.com Archived 7 September 2007 at the Wayback Machine, Rediff news website. Retrieved from "Rediff.com" on 15 May 2007.
  14. ^ Uutlookindia.com | wired
  15. ^ "Kaveri engine gathers momentum". Frontier India. Archived from the original on 18 December 2015. Retrieved 6 February 2015.
  16. ^ Sharma, Ravi (27 September 2008). "Kaveri engine programme delinked from the Tejas". The Hindu. Chennai, India. Archived from the original on 30 September 2008. Retrieved 28 September 2008.
  17. ^ "Kaveri in LCA by 2009". Archived from the original on 23 January 2009. Retrieved 19 August 2023.
  18. ^ "Flightglobal.com". Archived from the original on 4 December 2010. Retrieved 19 August 2023.
  19. ^ "Blogspot.com". Archived from the original on 8 July 2012. Retrieved 4 August 2010.
  20. ^ a b "Press Information Bureau English Releases". Archived from the original on 18 December 2015. Retrieved 6 February 2015.
  21. ^ "Bharat-Rakshak.com - Indian Military News Headlines". Archived from the original on 10 October 2012. Retrieved 6 February 2015.
  22. ^ a b "Press Information Bureau English Releases". Archived from the original on 18 December 2015. Retrieved 6 February 2015.
  23. ^ "India's Indigenous Jet Engine Successfully Flight Tested". Archived from the original on 12 July 2012. Retrieved 6 February 2015.
  24. ^ "Press Information Bureau English Releases". Archived from the original on 24 September 2015. Retrieved 6 February 2015.
  25. ^ "Kaveri engine completes tests in Russia News". Archived from the original on 6 May 2011. Retrieved 6 February 2015.
  26. ^ "Deccan Chronicle New Report". Archived from the original on 11 October 2012. Retrieved 7 August 2011.
  27. ^ a b "DRDO is ready to develop various engine classes for UAVs and marine propulsion systems, says Chairman S Kamat". Financialexpress. 24 January 2023. Retrieved 28 December 2023.
  28. ^ "DRDO develops near isothermal forging technology for aeroengines' parts". Business Standard. 28 May 2021. Retrieved 28 December 2023.
  29. ^ "DRDO develops critical crystal blade technology for aero engines". The Hindu. 26 April 2021. ISSN 0971-751X. Retrieved 28 December 2023.
  30. ^ Reddy, C. Manmohan (16 September 2002). LCA economics[usurped]. The Hindu.
  31. ^ a b c "Kaveri engine to power fifth generation fighter aircraft". The Hindu. Chennai, India. 26 January 2011. Archived from the original on 29 January 2011. Retrieved 26 January 2011.
  32. ^ Greg Waldron (4 November 2012). "India could test Kaveri engine on Tejas by end-2013". Flight Global. Bangalore, India. Archived from the original on 6 December 2012. Retrieved 4 December 2012.
  33. ^ Suman Sharma (10 December 2012). "Kaveri Successfully Completes Official Altitude Testing, Demonstrates First Block of Flight in Flying Test Bed (FTB) : Indian Defence Minister in Parliament". chhindits. Zhukhovsky, Russia. Archived from the original on 2 May 2013. Retrieved 13 December 2012.
  34. ^ Ajai Shukla (4 January 2013). "DefenceMin goes global in search for Kaveri partner". Bangalore, India.
  35. ^ "One India". 18 November 2014. Archived from the original on 3 June 2021. Retrieved 19 November 2014.
  36. ^ Punj, Vivek (29 November 2021). "HAL to manufacture first four light utility helicopters by 2022-23: Centre". Mint. Archived from the original on 30 March 2023. Retrieved 30 November 2021.
  37. ^ "Annual Report 2022-23" (PDF). Ministry of Defence. Government of India. Retrieved 30 March 2024.
  38. ^ "France offers EUR 1 billion to revive India's combat jet engine project". Economic Times. 4 July 2016. Archived from the original on 6 July 2016. Retrieved 4 July 2016.
  39. ^ Krishnan, Alnoor Peermohamed & Raghu (20 November 2016). "DRDO ties up with Snecma to revive gas turbine engine for Tejas". Business Standard India. Archived from the original on 21 November 2016. Retrieved 20 November 2016.
  40. ^ "L'avion de combat indien Tejas bientôt propulsé par le moteur M88 du Rafale ?". La Tribune (in French). 26 February 2018. Archived from the original on 15 May 2019. Retrieved 15 May 2019.
  41. ^ Design For Air Combat, Ray Whitford 1987, Jane's Publishing Company Limited, ISBN 0 7106 0426 2, p.140
  42. ^ Narayanan, Prasobh; Deepak, Jaison (17 February 2023). "Aero India 2023: GTRE completes high-altitude testing of Kaveri derivative engine". Janes.com. Retrieved 28 December 2023.
  43. ^ Rautela, Isha (11 February 2023). "Godrej Aerospace to build turbo engines in tie-up with DRDO research centre". BusinessLine. Retrieved 28 December 2023.
  44. ^ Bagade, Hrithik Kiran (17 February 2023). "Godrej Aerospace plans Rs 500 crore facility for defence business". The New Indian Express. Retrieved 29 December 2023.
  45. ^ Gupta, Pathikrit Sen; Sharma, Ankur (14 February 2023). "Exclusive | Indigenous Engine of Tejas on Its Way: ADE Director at DRDO Who Worked on LCA for 25 Years". News18. Retrieved 29 December 2023.
  46. ^ "Press Information Bureau English Releases". Archived from the original on 18 December 2015. Retrieved 6 February 2015.
  47. ^ "Breakthrough for GTRE scientists – develop marine version of the Kaveri engine". Archived from the original on 23 September 2015. Retrieved 6 February 2015.
  48. ^ Pubby, Manu. "Government set to clear Rs 3,000 crore plan to develop engine for India's first UCAV". The Economic Times. Archived from the original on 28 October 2019. Retrieved 1 December 2021.
  49. ^ Jackson FRAes, Paul (27 April 2017). Jane's All the World's Aircraft: Development & Production 2017-2018 (2017-2018) (105th ed.). Jane's Information Group. p. 244. ISBN 978-0710632500.
  50. ^ Jackson FRAes, Paul (27 April 2017). Jane's All the World's Aircraft: Development & Production 2017-2018 (2017-2018) (105th ed.). Jane's Information Group. p. 244. ISBN 978-0710632500.

External links

Wikimedia Commons has media related to GTRE GTX-35VS Kaveri.
  • Kaveri product detail on DRDO website
  • Kaveri engine gathers momentum
  • v
  • t
  • e
ProductsFaciltiesRelated
  • v
  • t
  • e
Aeronautics
Avionics
Other HAL programmes
Unmanned aerial vehicles
Armaments
Small arms
Artillery, ammunition
Armoured fighting
vehicles
Tanks
Infantry fighting vehicle
Other vehicles
Electronics,
computer science
Electronic warfare
Radars
Search
Fire-control
Airborne
Software
Missile systems
Ballistic missiles
Agni
Prithvi
SRBM
  • Shaurya
  • Prahaar
SLBM
Cruise missiles
Air-to-air missiles
Anti-tank missiles
Surface-to-air
Air-to-surface
Anti-ballistic
  • Prithvi Air Defence (PAD)
  • Advanced Air Defence (AAD)
  • PDV Mk.2
Torpedoes
  • TAL
  • ALWT
  • Varunastra HWT
Bombs
Precision guided
General purpose
People
Scientists
Engines
Important programmes