Hebbala metro station
Upcoming Namma Metro station under Blue Line
Preceding station | Namma Metro | Following station | ||
---|---|---|---|---|
Kempapura towards Krishnarajapura or Central Silk Board | Blue Line (under construction) | Kodigehalli towards KIAL Terminals |
Route map | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Location | |
---|---|
Hebbala is an upcoming elevated metro station on the north–south corridor of the Blue Line[1] of Namma Metro in Bangalore, India. This is a prime location for its neighbouring areas like Hebbal and Kempapura. This metro station is slated to become operational around June 2026.[2][3][4][5]
Station layout
Station Layout - To Be Confirmed
Hebbala track layout (TBC) | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Legend | ||||||||||||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms ** Proposed |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform # Southbound | Towards → Krishnarajapura / Central Silk Board Next Station: Kempapura Change at the next station for Orange Line or Red Line | |
Platform # Northbound | Towards ← KIAL Terminals Next Station: Kodigehalli | |
Side platform | Doors will open on the left | ||
L2 |
Connections
Entry/Exit
See also
- Bangalore
- List of Namma Metro stations
- Transport in Karnataka
- List of metro systems
- List of rapid transit systems in India
- Bangalore Metropolitan Transport Corporation
References
- ^ "Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty". timesproperty.com. Retrieved 14 December 2023.
- ^ "L&T bags track contracts worth ₹501 crore for Bangalore Metro Phase 2A & 2B | Metro Rail Today". Metro Rail Today: Gateway to Rail & Metro Industry. Retrieved 14 December 2023.
- ^ "Metro line to Bengaluru Airport to be ready by June 2026: D K Shivakumar". The Indian Express. 6 June 2023. Retrieved 14 December 2023.
- ^ "Bengaluru Airport Metro Line from KIA to Devanahalli Set for Completion by June 2026". TimesNow. 7 June 2023. Retrieved 14 December 2023.
- ^ "Metro's ORR, Airport line to be ready by Sept 2026, will benefit IT industry hugely: BMRCL". The New Indian Express. 16 September 2023. Retrieved 14 December 2023.
External links
- BMRCL English Archived 30 June 2019 at the Wayback Machine - BMRCL Official Website
- UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
- v
- t
- e
Namma Metro
Blue Line 5
Phase-2A | |
---|---|
Phase-2B | |
Not In Scope |
|
- ** Line(s) and its stations which have been Approved & Under Construction
Orange Line 6 **
ORR-West Line |
|
---|---|
Hosahalli-Kadabagere Line |
|
Red Line 7 **
- Hebbala ■■
- Ganga Nagar
- Veterinary College
- Mekhri Circle
- Guttahalli Palace
- Bengaluru Golf Course
- Basaveshwara Circle
- KR Circle
- Town Hall
- Shanthinagar
- NIMHANS
- Dairy Circle ■
- Koramangala II Block
- Koramangala Ill Block
- Jakkasandra
- Agara ■
- Ibbaluru ■
- Bellandur Gate
- Kaikondrahalli
- Doddakannelli
- Carmelaram
- Ambedkar Nagar
- Kodathi Gate
- Muthanalluru Cross
- Dommasandra
- Sompura
- Kada Agrahara Road
- Sarjapura
Depot(s)
- ■ Baiyappanahalli & Doddajala
- ■ Sumanahalli (TBC)
- ■ (TBC)
See also
*Stations in italics are Under Construction