Keiō New Line

Railway line in Tokyo, Japan
  • Shinsen Shinjuku
  • Sasazuka
Stations4[1]ServiceTypeCommuter railOperator(s)Keio CorporationHistoryOpenedOctober 30, 1978; 45 years ago (1978-10-30)TechnicalLine length3.6 km (2.2 mi)Number of tracksDouble-track Track gauge1,372 mm (4 ft 6 in)Minimum radius500 m (1,600 ft)Electrification1,500 V DC (Overhead line)Maximum incline3.5%

The Keio New Line (京王新線, Keiō Shinsen) is a 3.6-kilometer (2.2 mi) link which connects Keio Corporation's Keiō Line from Sasazuka Station in Shibuya to Shinjuku Station with through service on to the Shinjuku Line of the Tokyo Metropolitan Bureau of Transportation. The line opened on October 30, 1978.

Operations

The Keio New Line generally parallels the main Keio Line along National Route 20 (Kōshū Kaidō) on a deeper route. Except for a short section just before Sasazuka Station, the entire line is underground.

Because the line was built to normal railway standards and not to subway standards, only specially-designed trains can travel along the Keio New Line. However, since new train cars are being designed to be able to operate on above-ground and below-ground tracks there is no real issue with the differentiation. All trains operating west of Sasazuka Station start and arrive at Shinjuku Station. During events at the Tokyo Racecourse, there are express trains that operate from Fuchūkeiba-seimommae Station to Shinjuku Station.

The Keio New Line shares the same platforms with the Toei Shinjuku Line at Shinjuku Station. From here trains travel west-southwest. At Hatsudai Station, the westbound platform is two floors underground while the eastbound one is three floors underground. (Both platforms are on the north side of the station.) At Hatagaya Station both platforms are two floors underground with platforms on either side of the two central tracks. From this station, the Keio New line diverges from the Kōshū Kaidō and heads towards the Keio Line further south. The Keiō Line parallels the outside of the New Line on an elevated viaduct over Prefectural Route 420 (Nakano Dori) until Sasazuka Station.

Stations

Although there are four types of trains that travel along the Keiō New Line segment (local, rapid, semi express, and express), all trains within the Keiō New Line stop at every station.

No. Station km Connections Ward
Through-running to/from the S Toei Shinjuku Line towards Motoyawata
S01 Shinjuku
(New Line Shinjuku)
新宿
(新線新宿)
0.0 Shinjuku
Hatsudai 初台 1.7 Shibuya
Hatagaya 幡ヶ谷 2.7
Sasazuka 笹塚 3.6 Keiō Line
Through-running to/from the KO Keiō Line towards Hashimoto, Takaosanguchi, and Keiō-hachiōji

History

The Keio New Line began operation on October 30, 1978. With the completion of the last segment of the Toei Shinjuku Line, through service operations began on March 30, 1980.

See also

References

  1. ^ "route map of Keio New Line" (in Japanese). Retrieved June 20, 2021.

External links

  • Keio Corporation website (in Japanese)
  • Keio Corporation website (in English)


  • v
  • t
  • e
Keio railway lines
Keiō lines (1372mm, 4 ft 6 in)Keiō lines (1067mm, 3 ft 6 in)Related lineMajor stations
  • v
  • t
  • e
Shinkansen lines
Logo of the East Japan Railway Company (JR East) JR East lines
passing through
Central Tokyo
The logo of the Tokyo Metro. Tokyo Metro lines
Toei Subway lines
The logo of Yokohama Municipal Subway. Yokohama Municipal Subway
Logo of the East Japan Railway Company (JR East) JR East lines
in satellite cities
or suburbs
Keikyu
Keio
Keisei
Odakyu
Seibu
Sotetsu
Tobu
Tōkyū Railways
Other commuter
rail lines
Trams
Monorails
People movers
Hinterland
Funiculars and
aerial lifts
Bus services and hubs
Public ferries
Major terminals
Miscellaneous
  • Japan transit: Tokyo
  • Keihanshin
  • Nagoya
  • Fukuoka
  • Hakone Fuji Izu
  • Hokkaido
  • Aomori
  • Sendai
  • Akita
  • Niigata
  • Toyama
  • Nagano
  • Okayama
  • Hiroshima
  • Shikoku
  • Metro systems
  • Shinkansen
  • trams (list)
  • aerial lifts (list)