Madhya Pradesh Power Generation Company Limited

Indian government electricity company

MPPGCL
Company typeGovernment-owned Corporation-PSU
IndustryElectricity generation
FoundedThe Company was incorporated on 22.11.2001 & started functioning independently from 01-06-2005
HeadquartersJabalpur, Madhya Pradesh, India
Area served
State of Madhya Pradesh,India
Key people
Shri Sanjay Dubey (chairman)
Shri Manjeet Singh (managing director)
ServicesElectricity Generation
OwnerGovernment of Madhya Pradesh (100%)
Number of employees
4878
Websitewww.mppgcl.mp.gov.in

M.P. Power Generating Company Limited (MPPGCL) is the electricity generation company of the Government of Madhya Pradesh state in India.

Generation capacity

The installed capacity of MPPGCL as on 01.01.2019 is 6315 MW out of which madhya pradesh share is about 6312.50 MW.[1]

PLF (%) LAST 10 YEARS
YEARS ATPS STPS SGTPS SSTPP OVERALL
2009-10 45.89% 64.57% 65.99% N.A. 62.86%
2010-11 48.66% 60.51% 65.78% N.A. 61.10%
2011-12 54.66% 53.68% 70.20% N.A. 61.38%
2012-13 71.66% 55.26% 73.52% N.A. 66.24%
2013-14 74.3% 48.0% 67.8% N.A. 60.0%
2014-15 53.3% 52.9% 58.1% 26.23% 49.6%
2015-16 96.8% 47.2% 59.9% 40.4% 51.2%
2016-17 80.51% 31.28% 58.53% 23.54% 40.49%
2017-18 93.94% 43.09% 64.26% 35.90% 50.55%
2018-19 88.9% 64.1% 74.0% 61.1% 67.3%

Power stations

Thermal power stations coal based

Sr.No Project Capacity(in M.W.) Unit MW Status EPC Contractor(TG set and Boiler make)
1 Satpura Thermal Power Station 1330 1×200 MW, 3x210 MW, 2x250 MW All Unit Functional,however 200MW and 210 MW to be decommissioned soon ,1x660 MW under surveying BHEL
2 Amarkantak Thermal Power Station 210 1×210 MW All Unit Functional ,1x660 MW under surveying BHEL
3 Sanjay Gandhi Thermal Power Station 1340 4×210 MW,1×500 MW All Unit Functional BHEL(though ABL make boiler in 210MW units)
4 Shree Singaji Thermal Power Station 2520 2x600 MW, 2×660 MW(super critical) All Unit Functional. BHEL -600MW, L&T-MHPS-660MW

Total installed thermal capacity 5400 MW.

Hydel power stations

Sr.No Power Station Installed Capacity M.P.Share LOCATION/ RIVER
1 Gandhi Sagar(5x23 MW) 115 57.5 DISTT. MANDSOUR/ CHAMBAL RIVER
2 Pench,Totladoh(2x80 MW) 160 107 DISTT. NAGPUR/ PENCH RIVER
3 Rani Awanti Bai Bargi (2x45 MW) 90 90 BARGI, DISTT. JABALPUR/ NARMADA RIVE
4 Rajghat (3x15 MW) 45 22.5 RAJGHAT, DISTT. ASHOKNAGAR/ BETWA RIVER
5 Birsinghpur(1x20 MW) 20 20 BIRSINGHPUR, DISTT. UMARIYA/ JOHILA RIVER
6 Ban Sagar I Tons(3x105 MW) 315 315 SIRMOUR, DISTT. REWA BEEHAR RIVER
7 Ban Sagar II Silpara(2x15 MW) 30 30 SILPARA, DISTT. REWA/ CANA
8 Bansagar -III Deolond (3x20 MW) 60 60 DEOLOND, DISTT. SHAHDOL/ SONE RIVER
9 Bansagar -IV Jhinna (2x10 MW) 20 20 JHINNA, DISTT. SATNA/ JHINNA DYKE
10 Madhikheda (3x20 MW) 60 60 MADHIKHEDA, DISTT. SHIVPURI/ KALISINDH RIVER Total 1186 917.5

Two proposed Hydel unit at Chhindwara(2x45MW) and Murena(270 MW)

References

  1. ^ "M.P.Power Generating Company Limited". Archived from the original on 9 June 2010. Retrieved 28 August 2010.
  • v
  • t
  • e
Power stations and organizations of Madhya Pradesh
Power stationsOrganizationsRelated topics