Mahi Banswara Atomic Power Plant

Proposed nuclear power plant near Banswara, Rajasthan

23°31′46″N 74°35′26″E / 23.52944°N 74.59056°E / 23.52944; 74.59056[1]Construction began2024Construction cost50,000 crore (US$6.3 billion)Owner(s)NPCIL, NTPCOperator(s)NPCIL, NTPCNuclear power station Reactor typeIPHWR-700Reactor supplierNPCIL/BARCCooling sourceMahi Bajaj Sagar Dam, Mahi RiverPower generation Units planned4 x 700MW
[edit on Wikidata]

The Mahi Banswara Rajasthan Atomic Power Plant (MBRAPP) is a proposed nuclear power plant to be built on a 1,366.49 acres (553.00 ha) area, near Banswara district of Rajasthan.[2][1]

The project will have an installed capacity of 2800 Megawatts (MW).

History

Nestled in the tribal areas of Rajasthan, the Mahi Banswara project aims to kick start the region by providing jobs and investment opportunity and alleviating the power shortage in the state. The plant construction is scheduled for 2024 and will be jointly developed by NTPC and NPCIL. Along with Chutka Nuclear Power Plant, NTPC aims to generate 3500 MW of electricity from nuclear sources.[3][4]

Design and specification

The proposed 700 MW IPHWR-700 reactors are indigenous and similar to the ones currently under construction in Kakrapar Atomic Power Station (KAPP-3 &4) and Rajasthan Atomic Power Station (RAPP-7 & 8).

Cost and economics

The plant is jointly built by the Nuclear Power Corporation of India and National Thermal Power Corporation Limited, the project is estimated to cost 50,000 crore (US$6.3 billion). The project is a part of the fleet mode reactor program of the Government of India under which 10 indigenous IPHWR-700 reactors are being built. The construction will start in 2024 and is planned to be competed within 4-5 year.[5][6]

Units

Phase Unit
No.
Reactor Status Capacity in MWe Construction start First criticality Grid Connection Commercial operation Closure Notes
Type Model Net Gross
I 1 PHWR IPHWR-700 Planned 630 700 2030
2 PHWR IPHWR-700 Planned 630 700
3 PHWR IPHWR-700 Planned 630 700
4 PHWR IPHWR-700 Planned 630 700

See also

  • flagIndia portal
  • Nuclear technology portal
  • iconEnergy portal

References

  1. ^ a b "Mahi Banswara Rajasthan Atomic Power Project" (PDF). 12 February 2016.
  2. ^ "Proposal for Nuclear Power Plants in States". PIB (Press release). 15 March 2018.
  3. ^ "बांसवाड़ा परमाणु बिजलीघर में दूर होगा का बिजली संकट, जनवरी 2024 में शुरू होगा पहला रिएक्टर". NDTV (in Hindi). 5 September 2023.
  4. ^ "NTPC eyes 3.5 GW n-power by 2030, in talks for SMRs". Live Mint. 18 April 2023.
  5. ^ "India to get 7,000 MW from nuclear power by 2031 as govt grants bulk approval to reactors". Moneycontrol. 6 April 2023.
  6. ^ "The Government today informed that it has given bulk approval for the installation of ten nuclear reactors". PIB (Press release). 5 April 2023.
  • v
  • t
  • e
Uranium resourcesNuclear reactor technologies
Three-stage nuclear power programme
Stage I - PHWR
Stage II - FBR
Stage III - Thorium
Light Water Reactors
Electricity generation
Nuclear marine propulsion
Research reactors
BARC
  • APSARA
  • CIRUS
  • ZERLINA
  • Dhruva
  • PURNIMA-I
  • PURNIMA-II
  • PURNIMA-III
IGCAR
Proposed
  • Compact High Temperature Reactor
  • High-flux Research Reactor
Nuclear Power PlantsResearch and testingOrganisationsOther topics