Murraylink

HVDC underground power line in Australia

34°17′37″S 142°14′20″E / 34.29361°S 142.23889°E / -34.29361; 142.23889 (Red Cliffs Static Inverter Plant)
34°14′17″S 140°36′01″E / 34.23806°S 140.60028°E / -34.23806; 140.60028 (Berri Static Inverter Plant)FromBerri, South AustraliaToRed Cliffs, VictoriaOwnership informationOwnerEnergy Infrastructure InvestmentOperatorAPA GroupConstruction informationManufacturer of conductor/cableABBCommissioned2002Technical informationTypeunderground cableType of currentLight HVDCTotal length180 km (110 mi)Power rating220 MWAC voltage132 kV (Berri)
220 kV (Red Cliffs)DC voltage±150 kVNo. of poles2

Murraylink is an Australian high voltage direct current electricity transmission link between Berri in South Australia and Red Cliffs in Victoria, connecting the two state electricity grids. Murraylink was commissioned in 2002 and is believed to be the world's longest underground transmission system and cost more than A$177 million. It was built by TransEnergie Australia, a subsidiary of Hydro-Québec. It was sold to the Australian Pipeline Trust (APA Group) in March 2006 for A$153 million. In December 2008 ownership of Murraylink (as well as Directlink) was transferred to the newly formed Energy Infrastructure Investments Group, while APA continued as the operator.[1] The ownership of EII is APA with 19.9%, with the balance with Japan-based Marubeni Corporation with 49.9% and Osaka Gas with 30.2%.[2]

Capacity

Murraylink consists of two 180-kilometre (110 mi) long bipolar HVDC cables.[3] The circuit has an operating voltage of 150 kV and a transmission capacity of 220 megawatts. The link operates an "HVDC Light" voltage-source converter system, utilising insulated-gate bipolar transistors (IGBT), to convert electricity between alternating current and direct current.

While Murraylink is rated at 220MW, it is unable to operate at capacity during periods of high demand due to limitations in the transmission infrastructure at either end.[4] The limitations relate to thermal overload of transformers or transmission lines supplying the Riverland (for South Australia to Victoria transmission) and western Victoria (for Victoria to South Australia transmission).[5]

Sites

Site Coordinates
Red Cliffs Static Inverter Plant 34°17′37″S 142°14′20″E / 34.29361°S 142.23889°E / -34.29361; 142.23889 (Red Cliffs Static Inverter Plant)
Berri Static Inverter Plant 34°14′17″S 140°36′01″E / 34.23806°S 140.60028°E / -34.23806; 140.60028 (Berri Static Inverter Plant)

References

  1. ^ Electricity Transmission Network Service Providers - Directlink and Murraylink amended Cost Allocation Methodologies - March 2010
  2. ^ electricity interconnectors
  3. ^ "Murraylink - The world's longest underground power transmission system". ABB group. Retrieved 18 August 2019.
  4. ^ "Contingent Project Proposal" (PDF). Murraylink Transmission Company Pty Ltd. May 2012. p. 2. Retrieved 1 August 2017.
  5. ^ "Interconnector Capabilities for the National Electricity Market" (PDF). Australian Energy Market Operator. November 2017. pp. 7–8. Retrieved 24 April 2024.

External links

Map all coordinates using OpenStreetMap

Download coordinates as:

  • KML
  • GPX (all coordinates)
  • GPX (primary coordinates)
  • GPX (secondary coordinates)


  • v
  • t
  • e
Stub icon

This article about electric power transmission is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e