PKP class EP02

4 ft 8+12 in) standard gaugeDriver dia.1,100 mm (43.31 in)Length15,000 mm (49 ft 2+12 in)Width3,070 mm (10 ft 78 in)Height5,411 mm (17 ft 9 in)Loco weight81 t (80 long tons; 89 short tons)Fuel capacity2,840 L (620 imp gal; 750 US gal)Electric system/s3000 V DC CatenaryCurrent pickup(s)PantographEngine typeMV-185R
LKa-635Transmission69:22
78:31Loco brakeKnorrTrain brakesAir
Performance figures
Maximum speed100 km/h (62 mph)
Power output1,650 kW (2,210 hp)
1,600 kW (2,100 hp)
Tractive effort228 kN (51,000 lbf)
Career
OperatorsPKP
ClassEP02
LocalePoland

EP02 (also manufactured as Pafawag 1E) is a name for a Polish electric locomotive. It was made for passenger transport purposes.

Technical features

Few improvements were brought in with this locomotive type. The front and back of the box had dragging and bumping devices installed. The whole body was given a more aerodynamic shape compared to previous models. This machine is of Bo′Bo′ type, meaning that each axle is powered separately. The axles are installed in pairs on two bogies. The bogies had lighter, welded construction which gave the whole vehicle better contact with the rails.

The engines used in EP02 were not modern ones, and had a large weight compared with power and small rotation. The engine contained two engineer's compartments on each end, with all the devices necessary for running the locomotive inside. The engine and high voltage compartments were situated in the middle part of the body.

History

After World War II almost no electric locomotives survived in Poland, and local industry was not yet able to start the production of such vehicles. The solution for this problem was sought mainly abroad and resulted in a decision to buy some components from England. The design for EP02 by Central Rail Industry Construction Office in Poznań was ready in 1951.

Introduction

In 1951 the design was sent to Pafawag, but the construction met with a few obstacles, mainly lack of material and parts. The first locos were directed into Warsaw-Ochota railway district in 1953. Soon many construction faults appeared, like wheel spinning after reaching 70 km/h (43 mph) speed, inconstant drive and vertical shakes. The faults were systematically corrected, and the experience was used during designing the ET21 and EU06.

Production

Loco nos. Producer Years of production Quantity
01-07 Pafawag 1953–1954 7
08 Pafawag 1957 1

Operation

All the EP02s initially operated in Warsaw, but soon were moved to Łódź. Once there were enough EU07s, all EP02s were moved to Dębica. In 1971 the last three machines were retired and reassigned to work as heating power supplies (used solely to supply electric power from overhead to heat cars during longer stops at stations, it involved parking them at selected stations and removal of most of the electric, brake and control equipment, retaining only the pantographs and switches associated with the HEP supply). This prolonged EP02s’ life by 24 years—EP02-07 was working as a heating power supply in Zakopane until 1992 and EP02-08 in Przemyśl until 1996.

During the operation, the locomotives were modified by the addition of automatic brakes and heating systems.

Locomotive assignment

Loco nos. Operator Remarks
07 Chabówka - heritage park
02 Warsaw - railroad museum
08 Kraków

See also

External links

  • Modern Locos Gallery
  • Rail Service
  • Mikoleje
  • Chabówka Rail Museum
  • v
  • t
  • e
Rolling stock of Poland
Diesel
Standard gauge
Narrow gauge
ElectricSteam
Standard gauge*
Standard gauge**
Narrow gauge
  • Px27
  • Px29
  • Px38
  • Px48
  • Px49
  • T49
  • Tw47
  • Tw53
  • Tx23
  • Tx26
Multiple units
Electric
Diesel
Metro cars
  • Series withdrawn from service shown in italics.
  • * Own classes - steam locomotive classes built specially for PKP order in Poland or abroad
  • ** Foreign origin class