Sherbino Wind Farm

  • January 2021
Wind farm Type
  • Onshore
Power generation Units operational110Make and modelVestas V-90, Clipper Windpower C-96Nameplate capacity300 MW
[edit on Wikidata]

The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.[1]

Phase II, located on a 20,000-acre (8,100 ha) site 40 miles (64 km) west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW. This phase will be in operation by the end of 2011.[2][needs update]

See also

  • flagTexas portal
  • iconWeather portal
  • iconRenewable energy portal

References

  1. ^ BP Starts Full Commercial Operation at Texas Wind Farm
  2. ^ "BP Begins Construction On Sherbino Mesa II Wind Farm" North American Windpower Apr. 1, 2011.
  • v
  • t
  • e
Wind power by state
Large wind farms
Offshore wind farms
Wind power companies
  • icon Wind power portal
  • Category
  • Commons