Siemens Charger

North American diesel-electric passenger locomotive

  • 9.8 ft (3 m) (per truck)
  • 40.8 ft (12.436 m) (between truck centers)
Length71.5 ft (21.793 m)Width10 ft (3.048 m)Height14.4 ft (4.39 m)[2]Axle load67,500 lb (30,600 kg)Adhesive weight100%Loco weight260,000 lb (120,000 kg)Fuel typeDieselFuel capacity
  • SC-44/SCB-40: 1,800 US gal (6,800 L; 1,500 imp gal)
  • ALC-42/SCV-42: 2,200 US gal (8,300 L; 1,800 imp gal)
Prime moverCummins QSK95RPM range600–1,800Engine type45° V16, four stroke cycleAspirationTurbochargerDisplacement95 liters (5,800 cu in)[3]Traction motorsSiemens 3-phase AC induction motors; 978 hp (729 kW) eachHead end power660 or 1,000 kW; 3φ, 60 Hz, 480 V ACCylinders16Cylinder size5.9375 liters (362.33 cu in)TransmissionAC–DC–ACLoco brakeDynamic, regenerative, electropneumaticTrain brakesElectropneumaticSafety systemsPositive train control: ACSES II, I-ETMS
Performance figures
Maximum speed125 mph (200 km/h)
Power output
  • SCB-40: 4,000 hp (3,000 kW)
  • ALC-42/SCV-42: 4,200 hp (3,100 kW)
  • SC-44: 4,400 hp (3,300 kW)
Tractive effort
  • Starting: 290 kN (65,000 lbf)
  • Continuous: 275 kN (62,000 lbf)
Factor of adh.4.07 (24.57%)
Data refers to the following except where noted:[4][5]

The Siemens Charger is a family of diesel-electric/dual-mode passenger locomotives designed and manufactured by Siemens Mobility for the North American market.

There are five variants of the Charger, tailored for different operators and types of service: ALC-42 for Amtrak long-distance service, ALC-42E dual mode for Amtrak inter-city and long-distance routes that serve the Northeast Corridor, SC-44 for Amtrak state-supported inter-city service or commuter rail operators, SCB-40 for Brightline inter-city service and SCV-42 for VIA Rail inter-city service in Canada.

The first production Charger, a SC-44, was unveiled on March 26, 2016, and entered revenue service on August 24, 2017. It was followed by the SCB-40, which inaugurated Brightline service on January 13, 2018. The first ALC-42 was delivered to Amtrak on June 17, 2021, and entered revenue service on February 8, 2022, on the Empire Builder.

The Charger is often paired with Venture passenger cars, also built by Siemens, as part of a trainset.

Design

The Charger is powered by a Cummins 16-cylinder QSK95 4-stroke high speed diesel engine, which meets United States Environmental Protection Agency's more stringent Tier 4 emissions standards that took effect in 2015.[6] Power output varies by model: the SCB-40 produces 4,000 hp (3,000 kW),[7][8] the SC-44 produces 4,400 hp (3,300 kW), and both the SCV-42 and ALC-42 produce 4,200 hp (3,100 kW).[9][10] The maximum speed in service is 125 mph (201 km/h).[11]

The locomotive shares much of its overall design with the Siemens Vectron diesel and electric locomotives used in Europe and the Siemens ACS-64 electric locomotive built for Amtrak.

Four Insulated-gate bipolar transistor (IGBT) power inverters carry electric current to each of the four AC traction motors. A static inverter off of the main prime mover supplies head-end power (HEP). The locomotive also features dynamic braking with regenerative capability, allowing the locomotive to divert power generated by dynamic braking away from the resistor grids to HEP and onboard locomotive auxiliary power demands.[4]

In response to a 2013 Request for Information from Metro-North Railroad, Siemens said they would be capable of producing a dual-mode variant of the Charger with onboard energy storage for use by Metro-North and the Long Island Rail Road, as well as intercity service on Amtrak's Empire Corridor.[12]

California's SC-44s have aerodynamic "spoilers" on the rear of their roofs that match the height of bi-level California and Surfliner cars.[13]

The Charger series competes with other Tier 4 compliant locomotives, such as the EMD F125 and the MPI MPXpress MP54AC. However, unlike the Charger series, both the F125 and MP54AC have struggled to find customers, selling fewer than 50 units each.

Service history

Caltrans Charger pushing a San Joaquin train at Oakland – Jack London Square station in November 2017

The first production SC-44 unit was unveiled on March 26, 2016.[14] The first two Charger locomotives to leave Siemens' factory in Florin, California were transported to the Transportation Technology Center (TTC) in Pueblo, Colorado in June 2016 and underwent testing of performance metrics such as acceleration and braking.[15][16] The first Brightline SCB-40 locomotives were delivered in December 2016 to undergo testing in Florida.[17]

In February 2017, Amtrak and the Washington State Department of Transportation began testing one of the Midwest-bound locomotives along the Cascades corridor in the Pacific Northwest for federal certification.[18][19] Additional test runs were conducted on the Midwest and Northern California routes in April and May.[20] Testing at up to 135 miles per hour (217 km/h) was conducted at TTC and on the Northeast Corridor in September 2016 which resulted in federal certification for 125-mile-per-hour (201 km/h) operations.[21]

Revenue testing on the Capitol Corridor and San Joaquins routes in Northern California began on May 25, 2017.[22] During these tests, the trains operated with a second locomotive in case of failure.[23] The Northern California units were formally accepted and approved for solo service on October 23, 2017.[24] The SC-44 entered revenue testing on the Midwest routes in July 2017, with solo revenue service beginning on a Hiawatha Service train on August 24, 2017.[21][25] Revenue service on the Cascades route began in November 2017.[26]

Brightline began revenue operations with its SCB-40 locomotives on January 13, 2018.[27] The first Chargers for MARC began testing that month, and revenue service began on April 5, 2018.[28][29] Pre-revenue testing began on the Pacific Surfliner in October 2018; revenue service began later that year.[30][31]

The first ALC-42 for Amtrak's long distance trains was put into service on the westbound Empire Builder on February 8, 2022, after extensive testing in the Midwest and on the Empire Builder route. Of the 2 units on the inaugural service, one was Amtrak's "Day One" heritage unit #301.[32]

Customers

Owner Model Qty. Notes
Altamont Corridor Express SC-44 4
Amtrak ALC-42 125
ALC-42E 75[33]
Amtrak Midwest SC-44 33
Brightline SCB-40 21
California Department of Transportation SC-44 24
Coaster SC-44 9
Connecticut Department of Transportation SC-42DM 6
Exo EC42 10
MARC SC-44 8
Metro-North Railroad SC-42DM 27
Ontario Northland TBD 3
Trinity Railway Express SC-44 5
Via Rail SCV-42 32
Washington State Department of Transportation SC-44 10 Two on order to be delivered by 2026.
Total 392

Altamont Corridor Express

California regional commuter line Altamont Corridor Express ordered four SC-44 locomotives in April 2018, with deliveries beginning in December 2019.[34] They entered revenue service in 2020.[35]

Amtrak

Siemens ALC-42 at Portland Union Station

National network

On December 21, 2018, Amtrak ordered 75 ALC-42 locomotives with options for an additional 100. The first locomotive entered service in February 2022, with the last expected by 2024.[36]

Compared with the SC-44, changes were made to the ALC-42 to make it more suitable for long-distance service: additional positive train control systems for nationwide service, a larger 2,200-U.S.-gallon (8,300 L) diesel fuel tank (instead of 1,800 U.S. gal [6,800 L]), a larger diesel exhaust fluid tank, a larger sandbox, a more powerful 1,000-kilowatt head-end power generator (instead of 600 kW), an extended nose section for easier repair in the event of minor front-end collision, and a prime mover de-rated to 4,200 horsepower (3,100 kW) to lengthen maintenance intervals.[37][38]

Assembly of the first ALC-42 began in March 2020.[39] On August 5, 2020, Amtrak announced that one of the first six locomotives will be painted in a replica of the "Day 1" livery to commemorate 50 years of Amtrak service, while the other five will feature a preliminary "Phase VI" paint scheme.[40] The remainder of the fleet will introduce a new "Phase VII" livery. By February 2021, 12 units had begun production, with the first locomotive, AMTK 300, delivered to Amtrak on June 17.[41] The first ALC-42 locomotives entered revenue service on the Empire Builder on February 8, 2022. On the same day, Amtrak announced that they had ordered an additional 50 ALC-42s, bringing the total number of locomotives ordered to 125.[42]

Northeast Corridor

Amtrak plans to purchase at least 75 intercity trainsets with dual-mode ALC-42E locomotives from Siemens. The trainsets will be used primarily on routes that operate over both electrified and non-electrified track, which currently require costly and lengthy locomotive swaps when transitioning between electrified and non-electrified territory.[43][44]

In diesel mode, the ALC-42E will work like a typical diesel–electric locomotive, using its diesel engine to generate electricity for its motors. Each ALC-42E will be paired with a special trailer car that will have equipment to support electric mode on the end closest to the locomotive, and a passenger seating area on the other. There are two types of trailer cars:

  • An Auxiliary Power Vehicle (APV) will be used on trains that use track with overhead lines. Equipped with a pantograph and transformers, the APV will supply electricity to the ALC-42E as well as additional motors on its own powered truck. The ALC-42E/APV pairing will replace Amtrak's existing Siemens ACS-64 electric locomotives on trains that use the Northeast Corridor for part of their route.[43]
  • A battery car will be used on trains that access New York Penn Station via the Empire Connection, which has a third rail instead of overhead lines. The battery car will supply electricity to the ALC-42E in areas where diesel engine use is prohibited. The ALC-42E/battery car pairing will replace Amtrak's existing GE Genesis P32AC-DM dual mode locomotives, which draw electricity from the third rail in electric mode.[43]

By February 2024, two of the ALC-42E locomotives were under construction.[45]

State-supported corridors

WSDOT SC-44#1401 in Seattle

The Illinois Department of Transportation (IDOT), in conjunction with its counterparts in California, Michigan, Missouri and Washington, purchased 32 SC-44 locomotives for state-supported corridor services, operated by Amtrak under contract.

The $225 million order placed in March 2014 included options for an additional 75 corridor-configured locomotives[46][47] In 2015, IDOT ordered 12 additional units for use on the upgraded Lincoln Service corridor.[48] California ordered 14 additional units in November 2015 for use on the Pacific Surfliner beginning in 2018, plus two more units in 2016 for the Northern California services.[13][30] Washington state ordered an additional unit to replace the one lost in the 2017 Washington train derailment and two more in connection with its purchase of new Siemens trainsets.[49][50]

A total of 66 locomotives (32 base and 34 options) were ordered for Amtrak state corridors in this contract: 22 for California, 11 for Washington state, and 33 for the Midwest states.[51][52] Another 8 options were exercised by MARC, bringing total contract orders to 74.[53]

Brightline

SCB-40 built for Brightline

In September 2014, Brightline purchased ten SCB-40 locomotives with options for an additional eleven.[54][55] The locomotives are used in pairs, bookending four passenger cars (expandable to seven) on Brightline's Miami–West Palm Beach service. The SCB-40s have a streamlined front end that conceals the front coupler behind a removable nose cone and produce a maximum of 4,000 hp (3,000 kW) instead of the 4,400 hp (3,300 kW) on the SC-44.[56][8] Brightline later ordered five additional trainsets and one extra locomotive (eleven locomotives total) for use on the extension to Orlando, with delivery between September 2021 and 2023.[57] These locomotives have been able to reach speeds of up to 130 mph.[58] As of February 19, 2023, all trainsets and the spare locomotive have been delivered to Brightline.[59]

Coaster

A Coaster train at Oceanside

In June 2018, the North County Transit District Board of Directors approved the purchase of five SC-44s for its San Diego-area Coaster commuter rail service, replacing five older F40PH locomotives.[60] Deliveries began in August 2020 and are expected to conclude in the spring of 2021.[61] Two additional units were approved in June 2019, and another two in September. These additional locomotives will replace two existing F59PHI locomotives and allow increased service levels.[61][62] The first five locomotives entered revenue service on February 8, 2021.[63] Two more units were approved in 2020, and the last four entered service in 2023.

Exo

In January 2022, Montreal's Exo ordered 10 Siemens Chargers to update the fleet. They are planned to replace the aging F59PH locomotives.[64]

MARC

MARC announced in August 2015 that it was seeking $58 million to purchase eight locomotives to replace their aging electric-powered AEM-7 units, with deliveries planned for late 2017.[65] The purchase was approved by the Maryland Board of Public Works on September 16, 2015.[66] The MARC order uses part of the Amtrak state-corridor options.[53] The first MARC Charger was shipped from the Siemens factory in early December 2017, and began testing in mid-January 2018.[67]

Metro-North Railroad/ConnDOT

In December 2020, New York's Metropolitan Transportation Authority (MTA) approved a Federal Transit Administration-funded contract for 19 dual-mode locomotives based on the Charger design. The locomotives will replace the 31 existing GE Genesis locomotives used on the Metro-North Railroad's Hudson Line, Harlem Line, and Danbury Branch; they will use third rail electric power whenever available, instead of only in Manhattan. The contract had options for 144 additional locomotives: 40 for Metro-North, 66 for the Long Island Rail Road, 20 for the New York State Department of Transportation (for Amtrak Empire Service trains), and 25 for the Connecticut Department of Transportation (ConnDOT).[68][69]

Immediately after awarding the contract, Metro-North ordered an additional eight locomotives from its options, and ConnDOT ordered six from its options, bringing the total order to 33. The additional units will allow for the complete replacement of the P32AC-DM locomotives in the Metro-North equipment pool and allow for service increases on the Danbury and Waterbury branches. Delivery of the 33 locomotives is expected to be completed in 2027.[70]

After the orders, as of March 2024, the contract still has options for 32 locomotives for Metro-North, 66 for LIRR, 26 for NYSDOT and 19 for ConnDOT.

Ontario Northland

In December 2022, the Government of Ontario and Ontario Northland announced a CA$139.5 million investment to reinstate the Northlander passenger service between Timmins and Toronto. The government news release mentioned that the three new trainsets (each with three Siemens Venture passenger cars) will be built by Siemens Mobility and paired with Charger locomotives that will meet the latest EPA Tier 4 diesel emission standards.[71][72]

Trinity Railway Express

In February 2024, five locomotives were purchased for use on the Trinity Railway Express (TRE) commuter rail service operating in the Dallas/Fort Worth area. Delivery of the first locomotives is expected around summer 2026. The five locomotives are intended to replace the oldest units in the existing TRE fleet. TRE has the option to purchase up to six additional locomotives under the contract.[73][74]

Via Rail

VIA Rail Siemens Charger SCV-42 locomotive and Venture cars in Ottawa

In December 2018, Via Rail ordered 32 bi-directional trainsets each powered by one SC-44 locomotive for use on the Québec City–Windsor Corridor.[75] As with several other orders, the trainsets will use Siemens Venture passenger cars.

The first of VIA Rail's trainsets were delivered on September 29, 2021, to VIA Rail in Montreal, crossing into Canada via Sarnia, Ontario.[76] When the locomotives' final paint scheme was unveiled by VIA Rail in May 2021, the locomotive was designated as an SC-44,[77] but when delivered the locomotives' designation had been changed to SCV-42.[76] The trainsets entered service in 2022.

See also

  • EMD F125 – competing Tier 4 passenger locomotive
  • MPI MPXpress MP54AC – competing Tier 4 passenger locomotive

References

  1. ^ "Data sheet Bogie-platform SF 4" (PDF). Siemens Mobility. Retrieved April 9, 2023.
  2. ^ "America's Passenger Rail Experience" (PDF). Siemens Mobility. 2020. Archived (PDF) from the original on March 5, 2022. Retrieved August 3, 2022.
  3. ^ "QSK95 For U.S. EPA Tier 4/EU Stage IIIB And EPA Tier 3/EU Stage IIIA". Cummins. 2014. Retrieved January 3, 2016.
  4. ^ a b "Charger Diesel-Electric Locomotive: All Aboard Florida" (PDF). Siemens Mobility. 2014. Archived from the original (PDF) on June 23, 2016. Retrieved January 3, 2016.
  5. ^ "Charger Diesel-Electric Locomotive: IDOT, Caltrans, WSDOT" (PDF). Siemens Mobility. 2014. Archived from the original (PDF) on June 24, 2016. Retrieved January 3, 2016.
  6. ^ TRAINS Magazine (February 19, 2016). "Siemens Charger locomotive receives a Cummins engine" – via YouTube.
  7. ^ Glucksman, Marc (2018). "The Siemens Diesel-Electric Series". Passenger Train Journal. 42 (1): 18–21.
  8. ^ a b C. Vantuono, William (July 5, 2017). "Brightline going biodiesel". Railway Age. Retrieved February 13, 2018.
  9. ^ Guss, Chris (July 2016). "SC-44s on the horizon". Trains. 76 (7): 17.
  10. ^ "Amtrak Prepares for New Diesel Locomotive Fleet". Amtrak Media. August 5, 2020. Retrieved August 10, 2020.
  11. ^ Railway Age Staff (December 21, 2018). "Amtrak power renewal: 75 Siemens Chargers for long-distance trains". Railway Age. Retrieved February 27, 2022.
  12. ^ "A.4 Technical Explanation for 110 MPH Sustained Speed". A.4 Technical Explanation for 110 MPH Sustained Speed. Federal Railroad Administration. Archived from the original on August 7, 2020. Retrieved September 16, 2016.
  13. ^ a b "Cleaner Locomotive Fleet Powers Up: 22 New Units Ordered for State-Supported Amtrak Corridors" (PDF). The Mile Marker. Caltrans. December 2016. pp. 31–32.
  14. ^ "Siemens unveils first complete Charger locomotive". Railway Gazette International. March 30, 2016.
  15. ^ "First Siemens Charger locomotives head to TTCI". Railway Age. June 22, 2016.
  16. ^ "Charger diesel on test at Pueblo". Railway Gazette International. August 11, 2016.
  17. ^ "First Brightline trainset delivered". Railway Gazette International. December 14, 2016.
  18. ^ Chirls, Stuart (February 15, 2017). "New Amtrak Charger locomotives testing on Cascades route". Railway Age.
  19. ^ Gunnoe, Chase (February 20, 2017). "Amtrak Cascades route begins testing Siemens 'Charger' locomotive". Trains. Archived from the original on April 9, 2020. Retrieved November 29, 2018.
  20. ^ "New Siemens Charger Locomotives Begin Testing" (Press release). Illinois Department of Transportation. April 19, 2017.
  21. ^ a b Next Generation Equipment Committee (February 23, 2018). "Multi State Diesel Electric Locomotive Procurement: The Siemens Charger". NGEC Annual Meeting, February 23rd, 2018. American Association of State Highway and Transportation Officials.
  22. ^ "Meeting of the Board of Directors" (PDF). Capitol Corridor Joint Powers Authority. June 21, 2017.
  23. ^ "San Joaquins Operations Update" (PDF). San Joaquin Joint Powers Authority. July 28, 2017. p. 12. Archived from the original (PDF) on August 7, 2020. Retrieved November 29, 2018.
  24. ^ "Meeting of the Board of Directors" (PDF). Capitol Corridor Joint Powers Authority. November 15, 2017. p. 27.
  25. ^ "Siemens Charger solos for first time out of Chicago". Trains. August 24, 2017. Archived from the original on September 22, 2020. Retrieved August 27, 2017.
  26. ^ "Rail – Amtrak Cascades New Locomotives – Completed June 2017". Washington State Department of Transportation. Archived from the original on November 26, 2020. Retrieved November 29, 2018.
  27. ^ Chirls, Stuart (January 11, 2018). "Brightline slates fares and service date". Railway Age.
  28. ^ Edmonson, R G (January 15, 2018). "Maryland's MARC testing Chargers on passenger routes". Trains. Archived from the original on February 4, 2019. Retrieved November 29, 2018.
  29. ^ "MARC Riders Advisory Council Meeting minutes" (PDF). MARC Riders Advisory Council. April 19, 2018. Retrieved December 22, 2018.
  30. ^ a b "New, Cleaner Locomotives Coming Soon to the Amtrak Pacific Surfliner Service" (Press release). Amtrak. October 5, 2018.
  31. ^ "Charger Locomotive Deployment: 'The California Experience'" (PDF). Next Generation Equipment Committee – 2019 Annual Meeting. American Association of State Highway and Transportation Officials. February 22, 2019. Archived from the original (PDF) on August 7, 2020. Retrieved March 15, 2019.
  32. ^ Johnston, Bob (February 8, 2022). "Amtrak to order 50 more long-distance Siemens Chargers". Trains. Retrieved February 9, 2022.
  33. ^ Anderson, Kyle (August 21, 2023). "More Amtrak Airo Trainsets Ordered to Meet Surging Demand". Amtrak Media. Retrieved August 27, 2023.
  34. ^ "Altamont Corridor Express orders Charger locomotives". Trains Magazine. April 26, 2018. Archived from the original on October 21, 2020. Retrieved April 27, 2018.
  35. ^ "2020/2021 Work Program and Budget" (PDF). July 2020. p. 6. Archived from the original (PDF) on January 17, 2021. Retrieved March 15, 2021.
  36. ^ "Amtrak to Improve National Network with New Locomotives" (Press release). Amtrak. December 21, 2018. Archived from the original on May 20, 2022.
  37. ^ Federal Railroad Administration (January 10, 2020). Petition for Waiver of Compliance. 85 FR 1371
  38. ^ Johnston, Bob (February 8, 2022). "Amtrak to order 50 more long-distance Siemens Chargers". Trains. Retrieved April 2, 2022.
  39. ^ King, Charles (February 21, 2020). "Amtrak Procurement – NGEC Annual Meeting" (PDF). Next Generation Equipment Committee.
  40. ^ National Railroad Passenger Corporation (August 5, 2020). "AMTRAK PREPARES FOR NEW DIESEL LOCOMOTIVE FLEET" (Press release).
  41. ^ Hull, George (February 23, 2021). "Amtrak Passenger Service Rolling Stock Equipment Acquisition Update" (PDF). Next Generation Equipment Committee. Archived from the original (PDF) on October 15, 2022. Retrieved April 5, 2021.
  42. ^ Franz, Justin (February 8, 2022). "Amtrak's New ALC-42s to Enter Service Today". Railfan and Railroad Magazine.
  43. ^ a b c "Amtrak FY 2022–2027 Asset Line Plan" (PDF). Amtrak. pp. 125–7, 132.
  44. ^ Ruppert, Daniel P. (February 25, 2022). "Update on Acquisitions And Capital Programs" (PDF). PRIIA Section 305 Next Generation Corridor Equipment Pool Committee (NGEC). pp. 7, 8. Archived from the original (PDF) on March 7, 2022. Retrieved March 2, 2022.
  45. ^ Paul, Joe Sr.; Welsh, Michael; Kraft, Michael (February 2024). "Amtrak New Fleet Acquisition Updates" (PDF). Next Generation Corridor Equipment Pool Committee. p. 2.
  46. ^ "Siemens wins an additional locomotive contract in the USA" (PDF) (Press release). Berlin, Germany: Siemens Mobility. March 18, 2014. Retrieved January 3, 2016.
  47. ^ "Specification for Diesel-Electric Passenger Locomotives" (PDF). Amtrak. July 10, 2012. Archived from the original (PDF) on August 7, 2020. Retrieved January 3, 2016.
  48. ^ "Siemens to deliver 34 locomotives to three states in the U.S." (PDF) (Press release). Siemens Mobility. November 6, 2015.
  49. ^ Fesler, Stephen (December 16, 2022). "Amtrak Cascades Unveils Future 'Airo' Trainsets Launching in 2026". The Urbanist. Retrieved December 23, 2022.
  50. ^ Worrell, Carolina (December 19, 2022). "First Look: Amtrak Airo". Railway Age. Retrieved December 21, 2022.
  51. ^ Next Generation Equipment Committee (February 2017). "Multi State Diesel Electric Locomotive Procurement: The Siemens Charger" (PDF). American Association of State Highway and Transportation Officials. p. 2. Archived from the original (PDF) on August 7, 2020. Retrieved September 19, 2018.
  52. ^ "Siemens rolls out first Cascades Charger locomotive". Railway Gazette International. March 8, 2017.
  53. ^ a b "Marc to replace electric locomotives with diesels". International Rail Journal. August 13, 2015. Retrieved December 4, 2017.
  54. ^ "More Siemens Charger diesel locomotives ordered". Railway Gazette International. November 9, 2015. Retrieved January 3, 2016.
  55. ^ "All Aboard Florida Selects Siemens as Train Manufacturer" (Press release). Sacramento, California: Siemens Mobility. September 11, 2014. Archived from the original on March 16, 2016. Retrieved September 23, 2014.
  56. ^ "First look: Rail cars for new Florida passenger train". USA Today. June 10, 2016.
  57. ^ Johnston, Bob (January 8, 2021). "New Brightline details included in $950 million bond sale". Trains Magazine. Archived from the original on January 25, 2021. Retrieved February 1, 2021.
  58. ^ "BRIGHTLINE MAKES HISTORY AS FASTEST TRAIN IN FLORIDA". www.gobrightline.com. Retrieved March 7, 2023.
  59. ^ "Brightline's 'Bright Orange 2' Rolls Into Orlando". Railway Track and Structures. February 22, 2023. Retrieved March 11, 2023.
  60. ^ "NCTD Board Approves Purchase of New Locomotives to Serve San Diego County". North County Transit District. July 9, 2018. Archived from the original on April 30, 2019. Retrieved July 16, 2018.
  61. ^ a b "NCTD board approves Siemens locomotive order". Progressive Railroading. June 18, 2019.
  62. ^ "COASTER Improvements Fact Sheet" (PDF). North County Transit District. October 16, 2019.
  63. ^ "NCTD Celebrates Service Roll Out for New COASTER Locomotive and Overhauled Passenger Cars" (Press release). North County Transit District. February 8, 2021.
  64. ^ Evanko, Kara. "Siemens Mobility to Modernize Montreal's Exo Train Fleet With Sustainable Locomotives". Retrieved January 30, 2022.
  65. ^ Dresser, Michael (August 8, 2015). "MTA seeks $58 million for new MARC engines". Baltimore Sun. Archived from the original on April 21, 2019. Retrieved January 3, 2016.
  66. ^ "Board Of Public Works Approves $58 Million Contract For Eight MARC Locomotives" (Press release). Baltimore, Maryland: Maryland Transit Administration. September 17, 2015. Retrieved January 3, 2016.
  67. ^ "Siemens ships new locomotives for Septa and Marc". International Rail Journal. December 7, 2017. Retrieved January 28, 2018.
  68. ^ "Joint Metro-North and Long Island Committees Meeting". Metropolitan Transportation Authority. December 2020. pp. 128–132.
  69. ^ "Metro-North set to buy dual-mode locomotives from Siemens". Trains Magazine. December 14, 2020. Archived from the original on January 31, 2021. Retrieved February 1, 2021.
  70. ^ "Metro-North Railroad Procurements". Metropolitan Transportation Authority. June 20, 2023.
  71. ^ "Ontario Taking Next Steps to Bring Back Northeastern Passenger Rail". Government of Ontario (Press release). December 15, 2022. Retrieved December 20, 2022.
  72. ^ MacMillan, Sarah (December 15, 2022). "Province buying 3 trains for return of Northlander service". CBC News. Retrieved December 20, 2022.
  73. ^ Farr, Colby (February 12, 2024). "Regional Transportation Council awards $30M for new Trinity Railway Express trains". Community Impact. Retrieved February 16, 2024.
  74. ^ "Approval of a Contract for Five Locomotives for the Trinity Railway Express Fleet" (PDF). Trinity Railway Express. February 6, 2024.
  75. ^ "Siemens Canada secures major order with VIA Rail Canada for new fleet of passenger trains" (Press release). Siemens Mobility. December 12, 2018.
  76. ^ a b Via Rail [@VIA_Rail] (September 29, 2021). "Our new train has arrived and we couldn't be happier! // Notre nouveau train est arrivé et nous ne pourrions être plus heureux!" (Tweet). Retrieved September 30, 2021 – via Twitter.
  77. ^ "New Fleet Exterior Design Reveal". VIA Rail (Press release). Retrieved September 30, 2021.

Further reading

  • Next Generation Equipment Committee (December 2015). "Multi State Diesel Electric Locomotive Procurement: The Siemens Charger" (PDF). American Association of State Highway and Transportation Officials. Archived from the original (PDF) on January 10, 2017. Retrieved February 28, 2016.
  • Next Generation Equipment Committee (February 16, 2016). "Multi State Diesel Electric Locomotive Procurement: The Siemens Charger" (PDF). American Association of State Highway and Transportation Officials. Archived from the original (PDF) on January 26, 2021. Retrieved February 27, 2016.
  • "Siemens Charger Product Brochure" (PDF). Siemens Mobility Inc. 2020.

External links

Wikimedia Commons has media related to Siemens Charger locomotives.
  • Raw Footage of Siemens Charger SC-44 4601 Cummins QSK95 Testing (YouTube)
  • v
  • t
  • e
Current
Railcars and trainsets
Diesel locomotives
Dual-mode locomotives
Electric locomotives
Work locomotives
Former
Railcars and trainsets
Diesel locomotives
Dual-mode locomotives
Electric locomotives
Gas turbine trainsets
Work locomotives
Leased
  • v
  • t
  • e
Brightline
Stations
Rolling stock
Related
Connecting services
Brightline West
  • v
  • t
  • e
Brightline West
Stations
Planned stations
Rolling stock
Connecting services
Related
  • NOTE: Entire system is in planning stage
  • Category
  • Italics indicate future services
  • Category