This article needs additional citations for verification. (May 2019) |
SA21 Taman Selatan | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||
![]() | |||||||||||
General information | |||||||||||
Location | Taman Selatan, Klang, Selangor Malaysia | ||||||||||
Owned by | Prasarana Malaysia | ||||||||||
Operated by | Rapid Rail. | ||||||||||
Line(s) | ![]() | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Services | |||||||||||
|
The Taman Selatan LRT station is a light rapid transit (LRT) station that serves the suburb of Klang in Selangor, Malaysia. It is as one of the stations on the Shah Alam line. The station is an elevated rapid transit station in Taman Selatan, Klang, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]
History
[edit]This is the twenty-first station along the RM9 billion line project, with the line's maintenance depot located in Johan Setia, Klang. This LRT station will be expected to be operational in late 2025. [2] It will have facilities such as kiosks, restrooms, elevators, taxi stands, and feeder buses.[3]
Locality landmarks
[edit]- Taman Selatan Klang
- Southern Park commercial center
- Sekolah Khas Klang
- Kolej Komuniti Klang
- Euro Hotel
- SMK Tengku Ampuan Rahimah Klang (STAR)
- Hin Hua High School
- SK (1) & (2) Simpang Lima, Klang
- Regent International School Klang
- Taman Palm Grove
- Taman Chi Lieung
Bus Services
[edit]Feeder bus services will be announced once the station is fully operational.
Current bus services include Wawasan Sutera bus route 730 (to Klang and Banting) and Smart Selangor bus route KLG1 (to Klang bus hub only).
In addition, Rapid On-Demand feeder vans are also available, serving Teluk Gadong and KTM Klang.
References
[edit]- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "LRT3 Expected To Be Operational In Q3 Of 2025 - Loke". BERNAMA. 2024-07-29. Retrieved 2024-07-29.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
External links
[edit]