Tianhe Park station

Metro station in Guangzhou, China
Tianhe Park

天河公园
Guangzhou Metro
Concourse
Chinese name
Simplified Chinese天河公园站
Traditional Chinese天河公園站
Transcriptions
Standard Mandarin
Hanyu PinyinTiānhé Gōngyuán Zhàn
Yue: Cantonese
Jyutpingtin1ho4 gung1jyun4 zaam6
General information
LocationTianhe Park, Huangpu Avenue, Tianfu Road, Tianhe District, Guangzhou, Guangdong
China
Coordinates
Preceding station Guangzhou Metro Following station
Yuancun
Terminus
Line 21 Tangdong
towards Zengcheng Square

Tianhe Park station (Chinese: 天河公园站), is a station of Line 21 of the Guangzhou Metro. It started operations on 20 December 2019.[1] With the opening of Line 11 in 2024, line 21 will be truncated to here from Yuancun, as to allow line 11 trains to serve that station instead. It will also be an interchange station with Line 13 in 2024.[2]

Station layout

When fully complete in 2024, the station's total construction area of the station will be 78558 square meters, which is equivalent to 2.3 Gongyuanqian stations and 3.3 Yangji stations. It will also be the largest station on the whole of Guangzhou Metro.[3]

The station has 2 underground island platforms. Platform 1 is for trains heading to Zengcheng Square, whilst platform 2 is for trains heading to Yuancun. Platforms 3 and 4 are currently not in use, however, they will be put into service when Line 11 opens, serving Line 21 instead. On the other hand, platforms 1 and 2 will serve Line 11.

G - Exits B, E1, E2, F
L1 Lobby Customer Service, Vending machines, ATMs
L2
Platforms
Platform 2 arrow for L  21  towards Yuancun (Terminus)
Island platform, doors will open on the left
Platform 4  21  reserved platform
Platform 3  21  reserved platform
Island platform, doors will open on the left
Platform 1  21  towards Zengcheng Square (Tangdong) arrow for R

Exits

There are 4 exits, lettered B, E1, E2 and F. Exits B and E1 are accessible. Exit B is located on Middle Huangpu Avenue, whilst exits E1, E2 and F are located on Tianfu Road.

Gallery

  • Platform 1
    Platform 1
  • Paltform 2
    Paltform 2
  • Platform 1 projection showing both local and express trains
    Platform 1 projection showing both local and express trains
  • Concourse
    Concourse
  • Exit B
    Exit B
  • Exit E1
    Exit E1
  • Exit E2
    Exit E2
  • Exit F
    Exit F

References

  1. ^ "二十一号线真的官宣来啦!" (in Simplified Chinese). 19 December 2019.
  2. ^ "广州地铁13号线二期有了新进展 天河公园将借地围蔽施工" (in Simplified Chinese). 19 March 2019.
  3. ^ "天河公园站将成为广州规模最大地铁站". Guangzhou Metro (in Simplified Chinese). 13 August 2014.
  • v
  • t
  • e
Line 21