35°55′54″S 148°21′04″E / 35.93167°S 148.35111°E / -35.93167; 148.35111PurposeHydro-power, diversion, irrigationStatusOperationalOpening date1961Owner(s)Snowy HydroDam and spillwaysType of damGravity damImpoundsTumut RiverHeight46 m (151 ft)Length119 m (390 ft)Dam volume48 m3 (1,700 cu ft)Spillways1Spillway capacity2,152 m3/s (76,000 cu ft/s)ReservoirCreatesTumut Two ReservoirTotal capacity2,677 ML (94.5×10^6 cu ft)Catchment area396 km2 (153 sq mi)Surface area182 ha (450 acres)Power StationOperator(s)Snowy HydroCommission date1962TypeConventionalHydraulic head292.6 m (960 ft)Turbines4Installed capacity286 MW (384,000 hp)Annual generation787 GWh (2,830 TJ)

Tumut Two Dam or Tumut Two (/ˈtjmət/)[1] is a major ungated concrete gravity dam across the upper reaches of the Tumut River in the Snowy Mountains of New South Wales, Australia. The dam's main purpose is for the generation of hydro-power and is one of the sixteen major dams that comprise the Snowy Mountains Scheme, a vast hydroelectricity and irrigation complex constructed in south-east Australia between 1949 and 1974 and now run by Snowy Hydro.

The impounded reservoir is called the Tumut Two Reservoir, or less formally, the Tumut Two Pondage.

Location and features

Completed in 1961, Tumut Two Dam is a major dam, located approximately 3 kilometres (1.9 mi) west of Cabramurra. The dam was constructed by a consortium comprising Kaiser-Walsh-Perini-Raymond based on engineering plans developed by the Snowy Mountains Hydroelectric Authority and the United States Bureau of Reclamation under contract from the Snowy Mountains Hydroelectric Authority.[2]

The dam wall comprising 48 cubic metres (1,700 cu ft) of concrete is 46 metres (151 ft) high and 119 metres (390 ft) long. At 100% capacity the dam wall holds back 2,677 megalitres (94.5×10^6 cu ft) of water. The surface area of Tumut Two Reservoir is 182 hectares (450 acres) and the catchment area is 396 square kilometres (153 sq mi). The spillway is capable of discharging 2,152 cubic metres per second (76,000 cu ft/s).[2][3]

Power generation

Downstream of the dam wall and located underground is Tumut 2, a conventional hydroelectric power station, that has four turbine generators, with a generating capacity of 286 megawatts (384,000 hp) of electricity; and a net generation of 787 gigawatt-hours (2,830 TJ) per annum. The power station has 262.1 metres (860 ft) rated hydraulic head. The underground powerhouse is located 244 metres (801 ft) below ground level.[4]

Tumut Two Reservoir

Tumut Two Reservoir or Tumut Two Pondage (sometimes also Tumut 2 Reservoir/Tumut 2 Pondage) is formed by the Tumut Two Dam. Snowmelt and other runoff enter the reservoir from the upper Tumut River and the dam impounds the river's natural flow above the Tumut Pond Dam wall and the Tumut Pond Reservoir.

Water from the reservoir, after passing over the spillway of the Tumut Pond Dam, flows downstream, above the underground Tumut 1 Power Station, and into the impounded waters of Talbingo Reservoir, formed by the Talbingo Dam; past Tumut 3 Power Station, into Jounama Pondage, formed by Jounama Dam; and then into Blowering Reservoir, formed by Blowering Dam, passing through Blowering Power Stations. The natural flow of the Tumut River continues into the Riverina region.

See also

  • iconEnergy portal
  • flagNew South Wales portal

References

  1. ^ Macquarie Dictionary. Melbourne: The Macquarie Library Pty Ltd. 2005. ISBN 1-876429-14-3. {{cite book}}: |work= ignored (help)
  2. ^ a b "Register of Large Dams in Australia". Dams information. The Australian National Committee on Large Dams Incorporated. 2010. Archived from the original (Excel (requires download)) on 12 December 2013. Retrieved 8 May 2013.
  3. ^ "Dams". Snowy Mountains Scheme. Snowy Hydro. Archived from the original on 3 May 2013. Retrieved 22 April 2012.
  4. ^ "Tumut-2 Hydroelectric Power Station Australia". Global Energy Observatory. 11 May 2012. Retrieved 8 May 2013.

External links

  • Bevitt, R.; Erskine, W.; Gillespie, G.; Harriss, J.; Lake, P.; Miners, B.; Varley, I. (May 2009). Expert panel environmental flow assessment of various rivers affected by the Snowy Mountains Scheme. NSW Department of Water and Energy. ISBN 978-0-7347-5656-5.
  • v
  • t
  • e
Dams and reservoirs
in Sydney
Sewerage and
other water infrastructure
in Sydney
Aqueducts
Pumping stations
Vent stacks
Other infrastructure
Regional dams and
reservoirs
Other water sources
Companies and
government agencies
Regulators
Historical
  • v
  • t
  • e
Energy in New South Wales
Generation
Biomass combustion
  • Broadwater Sugar Mill
  • Broadwater Biomass Co-Gen
  • Condong Sugar Mill
  • Condong Biomass Co-Gen
  • Harwood Sugar Mill
  • Redbank
  • Visy Paper, Tumut
Cogeneration
  • Amcor, Bomaderry
  • BlueScope Steel, Port Kembla
  • Macquarie University
  • Stadium Australia
  • University of Western Sydney
  • Visy Paper, Smithfield
Hydro-electric
Solar generation
Wind farms
Coal fired
Natural gas
  • Appin Mine
  • Belrose
  • Colongra
  • Earthpower Camelia
  • Jacks Gully
  • Liddell
  • Lucas Heights I
  • Lucas Heights II
  • Shoalhaven Landfill Gas Project
  • Smithfield Energy Facility
  • Sydney Water, Malabar
  • Tahmoor
  • Tallawarra
  • Teralba
  • Tower Mine
  • Uranquinty
  • Wilga
Generation companies
Distribution
Distribution network operators
Transmission network operators
Retail companies and brands
Historical
  • Advance Energy
  • Australian Inland
  • Bega Valley County Council
  • Brisbane Water County Council
  • Electricity Commission of New South Wales
  • EnergyAustralia (state government enterprise)
  • Great Southern Energy
  • Illawarra Electricity
  • Mackellar County Council
  • Macquarie County Council (Western Power)
  • New England County Council (New England Electricity)
  • North West County Council (North West Electricity)
  • Northern Riverina County Council (Northern Riverina Electricity)
  • Northern Rivers County Council (Northern Rivers Electricity)
  • NorthPower
  • Ophir County Council (Ophir Electricity)
  • Orion Energy
  • Oxley County Council (Oxley Electricity)
  • Pacific Power
  • Peel-Cunningham County Council (PCCC Electricity)
  • Prospect Electricity
  • Shortland County Council (Shortland Electricity)
  • Southern Mitchell County Council (Southern Mitchell Electricity)
  • Southern Riverina County Council (Southern Riverina Electricity)
  • Southern Tablelands County Council (Southern Tablelands Electricity)
  • St George County Council
  • Sydney County Council (Sydney Electricity)
  • Ulan County Council (Ulan Electricity)
  • White Cliffs Solar Power Station