Winscales Moor Wind Farm

Wind farm in Cumbria, England

54°38′24″N 03°29′49″W / 54.64000°N 3.49694°W / 54.64000; -3.49694StatusOperationalCommission dateMay 2009Owner(s)MistralPower generation Units operational7 X 0.85 MWMake and modelVestasNameplate capacity5.95 MWExternal linksWebsitewww.winscalesmoorwindfarm.comCommonsRelated media on Commons
[edit on Wikidata]

Winscales Moor Wind Farm is a group of 7 turbines located between the A595 and A66, near Winscales, in Cumbria, England. The turbines have a tip height of 81 metres, the total installed capacity is 5.95 MW. The wind farm was developed by Your Energy Ltd and is owned by Mistral Windfarms. Engineering Renewables Ltd manage the construction and operation.

Description

Otherwise known as the Winscales Extension, it is located adjacent to the original Winscales Wind Farm, built in 1999. There are seven Vestas V52 turbines producing an annual energy output of 18,800 MWh, equivalent to the needs of approximately 4,000 households.

Your Energy Ltd submitted an application to Allerdale Borough Council in December 2006 for approval and planning permission was granted in June 2007. It became operational in May 2009.

Cumbrian firm Story Construction were the main contractor appointed to build the wind farm. The Vestas turbines are 81 metres high: 50 metres to the hub and a 62-metre diameter rotor.

The wind farm will contribute £130,000 during its life towards projects in the parishes of Winscales, Great Clifton and Little Clifton.

Local projects to benefit include the Great Clifton Village Hall which received £5,200 towards a new central heating system, and Little Clifton Village Hall received £8,000 towards renovations.[1]

The fund is administered by the Cumbria Community foundation[2]

The wind farm is featured on a Windspotting Brochure produced for tourists to the area.

References

  1. ^ "Village gets energy-saving help from wind farm community fund". Workington Times & Star. 14 November 2008. Archived from the original on 20 February 2012.
  2. ^ "Applying for a grant". Cumbria Community Foundation. Archived from the original on 25 July 2011.

External links

  • flagEngland portal
  • iconWeather portal
  • iconRenewable energy portal
  • Cumbria Community Foundation website
  • v
  • t
  • e
Electricity generation in North West England
Power stations
Biomass
Closed
Coal
Closed
Gas
Active
Proposed/future
Incinerators/Waste
Active
Proposed/future
  • Ince
  • Weston Point
Nuclear
Active
Closed
Oil
Closed
Wind
Active
Tidal
Proposed/future
Organisations
flag North West England portal
  • v
  • t
  • e
Companies
Onshore wind farms
Active
Proposed
Offshore wind farms
Active
Proposed
Cancelled
Installation vessels
  • MPI Adventure
  • MPI Resolution
  • MPI Discovery
Other
  • icon Wind power portal
  • Category
  • Commons