Ahmedabad Suburban Railway | |
---|---|
Overview | |
Owner | Gujarat Infrastructure Development Board Indian Railways |
Locale | Ahmedabad |
Transit type | Suburban rail |
Number of lines | 2 (planned) |
Number of stations | 41 (planned) [citation needed] |
Daily ridership | 4,55,000 (Estimated) |
Headquarters | Ahmedabad |
Website | www |
Operation | |
Operator(s) | Western Railways |
Train length | 3 coaches |
Headway | 10 minutes |
Technical | |
System length | 52.96 km |
Track gauge | Broad gauge |
Ahmedabad Suburban Railway is a proposed regional rail system in the city of Ahmedabad, Gujarat, India. It will consist of two corridors with frequent commuter services aiming to decongest road traffic and enhance connectivity between suburban and industrial areas.
Corridors
[edit]Corridor 1: Barejadi – Ahmedabad Junction – Kalol
[edit]This route spans approximately 43.49 km and connects major suburban and industrial centers. Proposed stations include:
- Barejadi
- Geratpur
- Vatva
- Maninagar
- Ahmedabad Junction
- Sabarmati
- Chandkheda
- Khodiyar
- Saij Sertha Road
- Kalol
Corridor 2: Ahmedabad Junction – Naroda
[edit]This shorter corridor covers about 9.47 km and connects the city with the airport and northeastern suburbs. Proposed stations include:
- Ahmedabad Junction
- Asarva
- Ahmedabad Airport
- Saijpur
- Sardargram
- Naroda
History
[edit]The suburban railway was proposed to let people live in satellite towns and commute easily making less pressure on urban infrastructure. The project was conceptualised by the Delhi Metro Board around 2003. The Detailed Project Review was submitted to the Gujarat Infrastructure Development Board (GIDB) by Delhi Metro Rail Corporation in October 2005. GIDB sent it to RITES for verification. The project had received approval in 2009 but was not implemented.[1] During Vibrant Gujarat Global Investors Summit 2015, MOU was signed with Rail Vikas Nigam Ltd for a suburban railway system in Ahmedabad. Later it was announced in 2016 Union Rail Budget.[1] The project was revived in 2025 and a new viability studies was proposed.[2]
Corridors
[edit]The project will use the existing Right of Way of Indian Railways, passing through Ahmedabad by upgrading and integrating existing facilities. Two corridors are planned for Ahmedabad Suburban Railway.[1]
- Corridor 1 : Barejadi-Ahmedabad Junction-Kalol (43.49 km) with stops at Geratpur, Vatva, Maninagar, Sabarmati, Chandkheda, Khodiyar, and Saij Sertha Road
- Corridor 2 : Ahmedabad Junction-Naroda (9.47 km) with stops at Asarva, Ahmedabad Airport, Saijpur and Sardargram
See also
[edit]References
[edit]- ^ a b c Avasthi, Yogesh (26 February 2016). "Rail min breathes life into old suburban train project". Ahmedabad Mirror. Retrieved 27 September 2017.
- ^ "Revival of A'bad, Surat rail projects on cards". The Times of India. 18 June 2025. ISSN 0971-8257. Retrieved 19 June 2025.