Chord Line, Tamil Nadu

3 ft 3+38 in)Loading gauge4,725 mm × 3,660 mm (15 ft 6.0 in × 12 ft 0.1 in) (BG)[2]Electrification25 kV AC 50 HzOperating speed80 km/h (50 mph)
Route map

Legend
km
0
Viluppuram Junction Bus interchange Parking
NH332-IN.svg NH 332
Right arrow to Puducherry
8
Kandambakkam
Thenpennai River
16
Tiruvennainallur
25
Parikkal
Gadilam River
36
Ulundurupet
NH45-IN.svg NH 45
41
Meppuliyur
49
Puvanur
SH69-IN jct.svg SH 69
55
Vriddhachalam Junction Bus interchange Parking
Vellar River
SH16-IN jct.svg SH 16
NH532-IN.svg NH 532
65
Vriddhachalam Town
70
Talanallur
74
Pennadam
SH141-IN jct.svg SH 141
Manjal River
79
Ichchangadu
83
Mathur
92
Sendurai
95
Vellur (Halt)
100
Ottakovil
Madras Cements
NH136-IN.svg NH 136
109
Ariyalur
Perambalur–Ariyalur Road
116
Sillakudi
NH227-IN.svg NH 227
123
Kallagam
134
Kallakudi Palanganatham
138
Pullambadi
147
Kattur
Trichy-Paramsivapuram Road
152
Lalgudi
155
Mandurai
158
Valadi
NH227-IN.svg NH 227
162
Pichchandarkovil
NH45-IN.svg NH 45
164
Uttamarkovil
Kollidam River
167
Srirangam
Kaveri
170
Tiruchirappalli Town
Right arrow to Manjatidal (Golden Rock Byepass line)
176
Golden Rock Bus interchange Parking
UpperLeft arrow to Tiruchirappalli Goods yard
Good shed road overpass
178
Tiruchirappalli Junction Airport interchange Bus interchange Heritage railway Parking
Junction overpass

The Chord Line connects Viluppuram Junction and Tiruchirappalli Junction, via Virudhachalam Junction in Tamil Nadu. It is the vital, shortest and busiest route connecting Chennai Egmore and Southern Tamil Nadu.

History

Until 1927, Viluppuram Junction and Tiruchirappalli Junction were only connected by Main line that traversed through Kumbakonam and Mayavaram, which was 240 kilometres (150 mi). Hence, the need for shorter route arose and construction began on 22 August 1927 for a new railway line via Virudhachalam Junction in phases. Initially, the stretch between Viluppuram Junction and Virudhachalam were completed and opened on 1 December 1927, the Srirangam - Golden Rock stretch on 22 August 1927, Bikshandarkoil - Srirangam stretch on 12 December 1927 and the entire stretch began its operations since 1 February 1929. This line gradually reduced the Madras - Colombo journey by around four hours.[3]

Gauge conversions

The conversion from metre gauge to broad gauge was effected during 1992-93 and completed during September 1998.[4]

Electrification

This stretch was proposed for electrification phase by phase by CORE. The electrification was completed during 2010.[5]

Operations

Passenger services

The line experiences a heaviest traffic[6] handling about 30 passenger and 56 express trains passing through every day in addition to goods train, particularly during night.[7][8][9]

Freight services

The line has a number of Industrial establishments[10] which utilises their nearby railway stations for their logistics and transports such as Central Workshop (Golden Rock), Cement and gypsum factories at Trichy, Perambalur and Ariyalur,[11][12][13] and the Sugar factories at Villupuram and Vridhachalam,[14]

References

  1. ^ "Trains at a Glance July 2013 - June 2014". Indian Railways. Retrieved 1 January 2014.
  2. ^ J S Mundrey (2010). Railway Track Engineering (Fourth ed.). New Delhi: Tata McGraw Hill. p. 7. ISBN 978-0-07-068012-8. Retrieved 1 January 2014.
  3. ^ R. P. Saxena. "Indian Railway History Time line". Irse.bravehost.com. Retrieved 1 January 2014.
  4. ^ "Works And Contract Management". Comptroller and Auditor General of India. Archived from the original on 1 January 2014. Retrieved 1 January 2014.
  5. ^ "Electrification work from Villupuram to Tiruchi completed: E. Ahamed". The Hindu. 12 January 2010. Retrieved 1 January 2014.
  6. ^ R.Rajaram (15 May 2013). "Dindigul-Villupuram project set to cross another milestone". The Hindu. Retrieved 1 January 2014.
  7. ^ R.Rajaram (10 July 2010). "Tiruchi-Chennai line to get decongested". The Hindu. Retrieved 1 January 2014.
  8. ^ "Doubling work on 25-km stretch completed in Trichy division". The Times of India. 16 May 2013. Retrieved 1 January 2014.
  9. ^ "Kallakudi Palanganatham-Ariyalur railway line nearing completion". The Hindu. 16 August 2013. Retrieved 1 January 2014.
  10. ^ "Southern Railway - Tiruchchirappalli Division" (PDF). Southern Railway zone. Retrieved 1 January 2014.
  11. ^ "Analysis of alternatives" (PDF). Tamil Nadu Road Sector Project. p. 33. Archived (PDF) from the original on 3 March 2016. Retrieved 1 January 2014.
  12. ^ M. V. L. Manikantan (21 December 2013). "Proposed Karaikal-Peralam line to boost freight traffic". The Hindu. Retrieved 1 January 2014.
  13. ^ T. E. Raja Simhan (1 February 2010). "Karaikal scores high on rail connectivity". The Hindu. Business Line. Retrieved 1 January 2014.
  14. ^ W. Francis; Frederick Nicholson; C. S. Middlemiss; C. A. Barber; E. Thurston; G. H. Stuart (2002). Gazetteer of South India. New Delhi: Mittal Publications. p. 127. Retrieved 1 January 2014.

External links

  • Southern Railways - Official Website
  • v
  • t
  • e
Railways in Southern India
Authority
Zones and divisions
South Central
South Coast
Southern
South Western
Suburban and metro
Operational
Suburban
Metro
Proposed
WorkshopsDepots
Electric Loco
Diesel Loco
Steam Loco
Multiple Unit
  • Avadi
  • Bangalore
  • Kollam
  • Palakkad
  • Tambaram
  • Velachery
  • Vijayawada
Lines
Main
Broad Gauge
Mountain
Sections
Inactive
Passenger trainsStations
Major
Railway companies
Active
Defunct
Accidents
and incidentsRelated articles