Sivok Junction

Railway station in West Bengal, India

26°52′50″N 88°28′08″E / 26.8806°N 88.4689°E / 26.8806; 88.4689Elevation156 metres (512 ft)Owned byIndian RailwaysOperated byNortheast FrontierLine(s) Platforms2Tracks4ConstructionStructure typeStandard (on-ground station)ParkingYesBicycle facilitiesNoOther informationStatusOpen (construction – new line)Station codeSVQ Zone(s) Northeast Frontier Railway Division(s) AlipurduarHistoryElectrifiedYesLocation
Sivok is located in West Bengal
Sivok
Sivok
Location in West Bengal
Show map of West Bengal
Sivok is located in India
Sivok
Sivok
Location in India
Show map of India

Sivok railway station is a junction railway station in Darjeeling district, West Bengal. Its code is SVQ. The station serves Sevoke town. The station consists of two platforms.[1] The station lies on New Jalpaiguri–Siliguri–New Mal Junction–Hasimara–Alipurduar Junction route under Alipurduar division of Northeast Frontier Railway.[2][3] It is also the originating point of the Sevoke-Rangpo Railway Line which is under construction. This railway station is a scenic railway station as it falls under Mahananda Wildlife Sanctuary just ahead of Sevoke Railway Bridge over river Teesta.

Trains

Some of the trains that has stoppages in Sevoke are:

New railway line from Sevoke to Rangpo

  • v
  • t
  • e
Railways in the Siliguri area
Legend
 
Sivok–Rangpo line to Rangpo, Sikkim (
under
construction
)
21 km
13 mi
Sivok
10 km
6 mi
Gulma
8 km
5 mi
Siliguri Junction
12 km
7 mi
Matigara
6 km
4 mi
Siliguri Town
0
New Jalpaiguri
5 km
3 mi
Rangapani
New Jalpaiguri–Howrah line
via Barsoi
18 km
11 mi
Bagdogra

Sivok–Rangpo line, 44 km long line, will provide access to Gangtok in Sikkim.[6]

The foundation stone for construction of a new railway line from Sevoke railway station to proposed Rangpo railway station on the border of Sikkim and West Bengal was laid in October 2009 by the vice president of India.[7] In 2008, the line was proposed to be 53 km long with 1,676 mm (5 ft 6 in) broad gauge track but the final alignment is 45 km long with 3.5 km in Sikkim state and the rest in West Bengal state. The track will have 28 bridges and 14 tunnels and 38.5 km of the track will be in tunnels.[8][9] Bridges over deep gorges and valleys will provide a scenic journey.[citation needed] The track is due to be constructed through the foothills of the Kanchanjungha mountain range and the Teesta river valley. New railway stations will be constructed at Melli, Teesta Bazaar, Geil Khola, Riang, and Rangpo.[needs update][speculation?]

The Indian Railways signed a contract with the construction company, IRCON, only in May 2010 but the final alignment had not been fixed for the first 22 km through elephant sanctuary forest even in 2013 and the final clearance of environment ministry had not been received.[10] To obtain approval of the environment and forest ministry, the railways made a proposal in February 2013 to install elephant sensors along the stretch of the proposed railway line in Mahananda elephant sanctuary or run the trains at a speed of only 20 km per hour in the forest area and stop when an elephant is sighted close to the track.[11] People of two villages in East Sikkim, through which a 3.5 km stretch of the 45 km long railway line has been planned, had not agreed to give their land for laying the track.[12] The project cost has escalated from the estimated cost of Rs.13.4 billion in 2008[13] and construction of the railway line has not started even in 2018.

The Supreme Court of India approved the project in February 2016 with strict guidelines of the National Wildlife Board that cleared the project in June 2015 but ordered restricted speed, wireless animal tracking sensors and allowed digging of tunnels only during daytime. The railway line is needed for security and socio-economic reasons. The railway line will help troops and armaments move faster towards the Indo-Tibet border. Railway Board chairman visited and met the Northeast Frontier Railway (NFR) officials on 2 March 2018 to discuss the commencement of construction of the track and tunnels.[14]

  • Estimated cost: Rs.1,340 crore in 2008.
  • Length of final alignment: 44.98 km
  • Stations en route: Riang, Gailkhola, Tista Bazaar, Melli
  • Nearest junction: New Jalpaiguri (30 km from Sevoke through Siliguri Junction)
  • Route under tunnels: 38.53 km (86%)
  • Number of bridges: 28
  • Number of tunnels: 14
  • Longest tunnel: 5.1 km

References

  1. ^ "SVQ/Sivok". India Rail Info.
  2. ^ Elephant sensors may come up on railway line to Sikkim
  3. ^ Villagers’ nod to rail survey
  4. ^ "05777/New Jalpaiguri - Alipur Duar Tourist Special - New Jalpaiguri to Alipur Duar NFR/Northeast Frontier Zone - Railway Enquiry".
  5. ^ "15467/Siliguri - Bamanhat Express (UnReserved) - Siliguri to Bamanhat NFR/Northeast Frontier Zone - Railway Enquiry".
  6. ^ North East to get better Indian Railways connectivity! 5 major rail projects lined up, Financial Express, July 17, 2020.
  7. ^ http://www.constructionupdate.com/News.aspx?nId=WIcIBZdMByhLAS9Iyls+Og==
  8. ^ "Inspection survey for Sikkim rail link".
  9. ^ "The Hindu Business Line : Inspection survey for Sikkim rail link". Archived from the original on 31 January 2010. Retrieved 20 July 2012.
  10. ^ "North Bengal-Sikkim Railway Link - Railway Technology".
  11. ^ Balchand, K. (7 February 2013). "Elephant sensors may come up on railway line to Sikkim". The Hindu.
  12. ^ Villagers’ nod to rail survey, The Telegraph, August 28, 2012
  13. ^ http://www.indianrailways.gov.in/railwayboard/uploads/directorate/works/pdf/Other_Projects_080411.pdf [bare URL PDF]
  14. ^ "Coming Soon: West Bengal - Sikkim Rail project".
  • v
  • t
  • e
Eastern Railway
South Eastern
Railway
North East Frontier
Railway
Suburban rail
and urban transit