Chengdu–Dujiangyan intercity railway

Railway line in Sichuan Province, China
  • Sichuan province:
  • Chengdu
  • Dujiangyan
Termini
Stations21ServiceTypeHigher-speed railSystemChina Railway High-speed China Railway High-speedServices1Operator(s)China Railway CR ChengduHistoryOpenedMay 12, 2010 (2010-05-12)TechnicalLine length94.2 km (59 mi)Track gauge1,435 mm (4 ft 8+12 in) standard gaugeElectrification25 kV 50 Hz AC (Overhead line)Operating speed220 km/h (136.7 mph) max.
Stations and structures

Legend
Chengdu–Chongqing railway
Dazhou–Chengdu railway
Chengdu–Kunming railway
Chengdu
Baoji–Chengdu railway
Anjing
Chengdu West Ring railway
Xipu East
Line 2
Xipu
Line 2
Hongguangzhen
Pixian East
Pengzhou
Buxingjie
Pixian
Pengzhou South
Gucheng (Planned)
Pixian West
Sandaoyan (Planned)
Xinmin (Planned)
Pengzhou Branch Line
Ande
Chongyi (Planned)
Juyuan
Lidui Branch Line
Dujiangyan
Yingbin Road (Planned)
Libing Square (Planned)
Qingchengshan
Lidui Park

The Chengdu–Dujiangyan intercity railway is a dual-track, electrified, passenger-dedicated, higher-speed rail line in Sichuan Province, connecting the provincial capital, Chengdu with the satellite city of Dujiangyan. The line is 65 kilometres (40 mi) in length with 15 stations. China Railways CRH1 train set on the line reach a maximum speed of 220 kilometres per hour (140 mph) and make the full-trip in 30 minutes, before 2018. The line was built in 18 months and entered into operation on May 12, 2010. The railway is built to withstand an 8.0-magnitude earthquake. The Chengdu–Dujiangyan intercity railway has two branch lines: Pengzhou Branch line is 21.2 kilometres (13.2 mi) in length with 6 stations,[1] and Lidui Branch line is 6 kilometres (3.7 mi) in length with 3 stations.[2] In 2019, China Railways CRH6A-A (Tianfu) train sets on the line started to operate up to 200 kilometres per hour (120 mph).[3]

Route

The railway runs from Chengdu railway station to Dujiangyan's Qingchengshan railway station and passes through Pidu District. Bridges and tunnels account for 67.8% of the line's total length. The longest viaduct is some 21 kilometres (13 mi). The line is built to withstand future earthquakes. Sound insulation panels were installed alongside the railway to reduce train noise near the tracks.[4] Clear panels allow passengers to enjoy rural scenery along this route.[4] The line shortened rail travel time from Chengdu to Dujiangyan by half, and will bring more tourist traffic to Dujiangyan's World Heritage Sites, the city's ancient irrigation system and Mount Qingcheng, a sacred Daoist mountain.

  • Chengdu–Dujiangyan high-speed railway under construction
    Chengdu–Dujiangyan high-speed railway under construction
  • Chengdu–Dujiangyan high-speed railway's elevated tracks
    Chengdu–Dujiangyan high-speed railway's elevated tracks

Trains

Cross-platform interchanges between different train categories between different train categories in Xipu Railway Station, Chengdu. The double track of the urban railway (Line 2 of Chengdu Metro) is in the middle, while the double track of National rail transport system (Chengdu–Dujiangyan intercity railway) is on both sides, respectively. It is the first implementation of Cross-platform interchanges between different train categories in China.[5]

The route uses CRH1 trains in eight-car train sets, which can carry 661 passengers.[6] Each day, 14 pairs of trains are scheduled daily between Chengdu and Qingchengshan Station, and 1 pair of trains are scheduled daily between Chengdu and Dujiangyan Station. 6 pairs start Chengdu Station and head up the Pengzhou Branch.

Stations

Stations and structures of Chengdu–Dujiangyan intercity railway

Prices

Prices(¥) Chengdu Xipu Hongguangzhen Pi County West Dujiangyan Qingchengshan
Chengdu - 5 5 10 15 15
Xipu 5 - 5 5 10 10
Hongguangzhen 5 5 - 5 10 10
Pi County West 10 5 5 - 10 10
Dujiangyan 15 10 10 10 - 5
Qingchengshan 15 10 10 10 5 -

History

On May 28, 2008, 16 days after the Wenchuan earthquake devastated Dujiangyan and the western suburbs of Chengdu, the Chengdu city government and the Ministry of Railways agreed to build a high-speed railway line as part of the reconstruction of the disaster zone.[7] Construction began on November 4, 2008 and involved 20,000 workers at the cost of ¥13 billion.[4] The line entered trial operation on April 1, 2010 and full commercial operation began on May 12, 2010, the second anniversary of the large earthquake that killed some 70,000 people in the region.[4]

References

  1. ^ 成灌“快铁”本月开工 建成后30分钟内到青城山 (in Simplified Chinese). China Railway. 2008-10-08.[permanent dead link]
  2. ^ 半小时到彭州! 成灌快铁彭州支线明年通车 (in Simplified Chinese). 四川新闻网-成都日报. 2012-11-11. Archived from the original on 2010-05-20. Retrieved 2019-05-13.
  3. ^ 天府号”相当巴适!市民体验成灌快铁公交化首日运营
  4. ^ a b c d Zhang Jiawei, "High-speed rail to bring in new era for Chengdu after quake" China Daily 2010-05-12
  5. ^ "成灌快铁犀浦站正式开建". 成都市官方网站. 2009-08-26. Archived from the original on 2014-04-24. Retrieved 2013-08-08.
  6. ^ (Chinese) "震后四川建首条城际快客 连通成都和都江堰" 新民晚报 2010-05-12
  7. ^ (Chinese) "汶川震区首个灾后重建重大项目成灌快铁建设纪实" Xinhua 2010-05-12

External links

  • Media related to Chengdu-Dujiangyan Intercity Railway at Wikimedia Commons
  • v
  • t
  • e
Public transportation in Sichuan Province (SC)
Chengdu Metro Chengdu Metro Chengdu Metro
Lines in operation
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 17
  • 18
  • 19
Under construction
  • 8 (phase II)
  • 10 (phase III)
  • 13
  • 17 (phase II)
  • 18 (phase III)
  • 27
  • 30
  • S3
  • S5
  • S11
Guang'an Metro Guang'an Metro
Under construction
  •  1 
Planned
  •  2 
China Railway C-train
Lines in operation
  •  CG 
  •  CP 
China Railway Intercity rails
Lines in operation
Chengdu Trams
Lines in operation
  • T2
Under construction
  •  Xinjin R1 
  •  Dujiangyan M-TR 
Under planning
  • T1
Other rail transits
Under construction
  •  Dujiangyan–Siguniangshan 
Chengdu BRT
Lines in operation
  • Line K1 / Line K1A (clockwise)
  • Line K2 / Line K2A (anticlockwise)
  • Line K3
  • Line K5
  • Line K11
  • Line K12
  • Line K13
  • Line K16
Transportation hubs
List of airports in China Int'l airports
China Railway Railway stations
  • China: AH
  • BJ
  • CQ
  • FJ
  • GD/HK/MO
  • GS
  • GX
  • GZ
  • HA
  • HB
  • HE
  • HI
  • HL
  • HN
  • JL
  • JS
  • JX
  • LN
  • NM
  • NX
  • QH
  • SC
  • SD
  • SH
  • SN
  • SX
  • TJ
  • XJ
  • XZ
  • YN
  • ZJ
  • v
  • t
  • e
Chengdu–Dujiangyan intercity railway
Chengdu–Qingchengshan
Pengzhou branch
  • Pixianxi
  • Xinminchang
  • Sandaoyan
  • Gucheng
  • Pengzhounan
  • Buxingjie
  • Pengzhou
Lidui branch
  • v
  • t
  • e
China Railway CR S-train
Beijing
  • Sub-Central
  • S2
  • Huairou–Miyun
  •  Tongmi 
Tianjin
  •  Jinji  (S9)
Yangquan
  •  Yangda 
Lianyungang
  •  Lianyungang Suburban 
Ningbo
  •  Yongyu  (S1)
Shaoxing
  •  Shaoxing Urban Rail 
Haikou
  •  Haikou Suburban 
CRH C-train
CR Shenyang
  •  Changhun 
  •  Changbai 
  •  Bai'a (BCT-WWT) 
CR Beijing
  •  Jingjin 
  •  Jingxiong 
CR Zhengzhou
  •  Zhengkai 
  •  Zhengjiao 
  •  Zhengji 
CR Shanghai
  •  Jinshan 
CR Wuhan
  •  Wuxiao 
  •  Wuxian 
  •  Wuhuang 
CR Chengdu
  •  Chengguan 
  •  Chengpu 
  •  Guikai 
  •  Guiyang Loop Line 
  •  Yuwan 
CR Jinan
  •  Qingrong 
CR Guangzhou
  •  Guangzhu 
  •  Zhuji 
  •  Guangfozhao 
  •  Guanhui 
  •  Guangshen 
  •  Suishen 
  •  Xiashen (IOQ-OGQ) 
  •  Changzhutan 
CR Lanzhou
  •  Lanzhong 
  • v
  • t
  • e
High-speed demonstrative maglev
Coastal
Hangshen
parallel
other branches
Beijing–Shanghai
West route
East route
branches
Beijing–Hong Kong (Taipei)§
To Hong Kong
To Taipei
Harbin–Hong Kong (Macau)§
Hohhot–Nanning
Beijing–Kunming
Branch lines
Baotou (Yinchuan)–Hainan
Lanzhou (Xining)–Guangzhou
Suifenhe–Manzhouli
Beijing–Lanzhou
Qingdao–Yinchuan
Eurasia Continental
Yangtze River
Old line
Shanghai–Kunming
Xiamen–Chongqing
Guangzhou–Kunming
Intercity and
long-distance
Regional intercity
Upgraded old lines
  • Italics: under construction or currently not operational
  • (-), Place A-: section under construction or currently not operational
  • §: in/related to Hong Kong, Macau, Taiwan
  • (Place A–Place B): share tracks with other lines
  • v
  • t
  • e
Technologies
High-speed trains
350 km/h
(217 mph)
or more
300–349 km/h
(186–217 mph)
250–299 km/h
(155–186 mph)
200–249 km/h
(124–155 mph)
Experimental and prototype high-speed trains (category)
High-speed railway line
By countries and territories

planned networks in italics
Africa
Americas
Asia
Europe
Oceania